| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC GUWAHATI ASSAM | GUWAHATI | ASSAM | ₹4.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹4.3 Cr+₹5.4 L (1.26%)Rejected-AOC | ₹4.3 Cr+₹5.4 L (1.26%) | L2 | Rejected-AOC Not Awarded |
| Sl No | Description | Qty | Unit | M/S MIRUSI ENTERPRISE L1 | NH TECHNOCRATS L2 |
|---|---|---|---|---|---|
| 1.00A. Construction of 5th Floor | |||||
| 2.00 | 26.81: Providing and fixing Scaffolding net of required width made of high density Polyethylene UV stabilized knitted on warp knitting machines having density 100grams/sqm and shading coefficient minimum 75% around the construction site/ for vertical extension as per requirement including fastening/tying with building/scaffolding pipes or with any other fixtures etc. complete as per direction of Engineer-in-Charge. (One time payment shall be made for providing Scaffolding net from start of work till completion of work including shifting if any. The Scaffolding net shall be the property of the contractor on completion of the work) | 2,484 | sqm | 26.86 ₹66,720.24 Lowest | 27.11 ₹67,341.24 |
| 3.00 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 31,420.3 | Kg | 95.93 ₹30,14,149.38 Lowest | 96.82 ₹30,42,113.45 |
| 4.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 507.31 | Sqm | 650.93 ₹3,30,223.3 Lowest | 657.02 ₹3,33,312.82 |
| 5.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 213.84 | Sqm | 860.55 ₹1,84,020.01 Lowest | 868.59 ₹1,85,739.29 |
| 6.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.3: Suspended floors, roofs, landings, balconies and access platform | 450.59 | Sqm | 820.21 ₹3,69,578.42 Lowest | 827.87 ₹3,73,029.94 |
| 7.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.7: Stairs, (excluding landings) except spiral-staircases | 32.03 | Sqm | 703.79 ₹22,542.39 Lowest | 710.37 ₹22,753.15 |
| 8.00 | 5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 78.63 | Cum | 10,898 ₹8,56,909.74 Lowest | 10,999.85 ₹8,64,918.21 |
| 9.00 | 5.3 Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth
level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 132.94 | Cum | 11,469.65 ₹15,24,775.27 Lowest | 11,576.84 ₹15,39,025.11 |
| 10.00 | 6.13 Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.
6.13.1 Cement mortar 1:3 (1 cement :3 coarse sand) | 334.01 | sqm | 1,116.12 ₹3,72,795.24 Lowest | 1,126.55 ₹3,76,278.97 |
Tender Value
₹4.3 Cr
EMD Value
₹8.5 L
Closing Date
16 Mar 2026, 2:00 pmClosed
Managing Director
Office of the Managing Director, APTDC Ltd., Ganeshguri, Ghy, 5
Construction of 5th and 6th floor of the new building (Block II) in the Directorate of Assam Institute of Research for Tribals and Scheduled Castes under Article 275 (1) of the Constitution of India during the year 2024-25.
2026_WPTBC_51802_1
PTDC/Engg/2026-27/525
Open Tender
Civil Works
Item Rate
730 days
Kamrup Metro
Please refer to tender document
3 documents required · 3 mandatory
₹9,000
₹8.5 L
Yes
Managing Director, APTDC Ltd., Ganeshguri, Ghy, 5
16 May 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
11 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A. Construction of 5th Floor | - | - | - | - |
| 2 | 26.81: Providing and fixing Scaffolding net of required width made of high density Polyethylene UV stabilized knitted on warp knitting machines having density 100grams/sqm and shading coefficient minimum 75% around the construction site/ for vertical extension as per requirement including fastening/tying with building/scaffolding pipes or with any other fixtures etc. complete as per direction of Engineer-in-Charge. (One time payment shall be made for providing Scaffolding net from start of work till completion of work including shifting if any. The Scaffolding net shall be the property of the contractor on completion of the work) | 2,484 | sqm | 25.1 | ₹62,348.4 |
| 3 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 31,420.3 | Kg | 89.65 | ₹28,16,829.9 |
| 4 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 507.31 | Sqm | 608.35 | ₹3,08,622.04 |
| 5 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 213.84 | Sqm | 804.25 | ₹1,71,980.82 |
| 6 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.3: Suspended floors, roofs, landings, balconies and access platform | 450.59 | Sqm | 766.55 | ₹3,45,399.76 |
| 7 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.7: Stairs, (excluding landings) except spiral-staircases | 32.03 | Sqm | 657.75 | ₹21,067.73 |
| 8 | 5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 78.63 | Cum | 10,185.05 | ₹8,00,850.48 |
| 9 | 5.3 Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth
level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 132.94 | Cum | 10,719.3 | ₹14,25,023.74 |
| 10 | 6.13 Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.
6.13.1 Cement mortar 1:3 (1 cement :3 coarse sand) | 334.01 | sqm | 1,043.1 | ₹3,48,405.83 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
SBD.pdf
Tender Documents • 1.12 MB
BOQ_82132.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .