Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹59.4 LAdmitted-Finance | -14.99% | ₹59.4 L | L1 | Admitted-Finance |
| 2 | L2₹71.6 L+₹12.2 L (20.6%)Admitted-Finance | +2.51% | ₹71.6 L+₹12.2 L (20.6%) | L2 | Admitted-Finance |
Tender Value
₹75 L
EMD Value
₹1.5 L
Closing Date
4 May 2026, 6:00 pmClosed
Executive Engineer
m and h sikar
Remaining Work at 2nd Floor of 50 Bedded Ayurvedic Hospital at Sikar, Distt. Sikar.Phase -2 (II)
2026_MEDIC_554774_1
NIT 04 2026-27 divi sikar
Open Tender
Civil Works - Buildings
Percentage
180 days
sikar
refer bids
2 documents required · 2 mandatory
₹2,000
refer bids
₹1.5 L
Yes
8 May 2026
29 Apr 2026
5 May 2026
29 Apr 2026
4 May 2026
29 Apr 2026
29 Apr 2026 - 4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2Part-A 'Civil Work' | |||||
| 2.01 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge. | 5 | cum | 930 | ₹4,650 |
| 2.02 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar. | 30 | cum | 538 | ₹16,140 |
| 2.03 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lea | 604 | sqm | 80 | ₹48,320 |
| 2.04 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : | - | - | - | - |
| 2.05 | Cement Mortar 1:6 (1-Cement:6-coarse sand). | 166 | cum | 4,990 | ₹8,28,340 |
| 2.06 | Add extra for Square or Rectangular Pillars in Superstructre brick work up to five storey Upto 90 cm length and all sides are free | 5 | Cum | 278 | ₹1,390 |
| 2.07 | Half brick masonry in Superstructure , above plinth level upto floor V level using bricks of designation 75 | - | - | - | - |
| 2.08 | Cement mortar 1 : 4 (1 cement : 4 coarse sand) | 151 | sqm | 553 | ₹83,503 |
| 2.09 | Add extra providing and placing in position 2 Nos. ,6mm Ø M.S. bar at every third course of half brick masonry . | 151 | sqm | 64 | ₹9,664 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.10 MB
Tendernotice_2.pdf
PDF • 35.86 MB
Tendernotice_3.pdf
PDF • 3.44 MB
Tendernotice_4.pdf
PDF • 0.19 MB
BOQ_988053.xls
BOQ • 0.46 MB
specialdocuments.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .