| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹72.3 L+₹6.0 L (8.99%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹77.5 L+₹11.2 L (16.9%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAKESH KUMAR GUPTA L2 | RAJESH KUMAR L1 | M/S PUSHPINDER SINGH & BROTHERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Design, Construction, Testing & Commissioning of RCC Over Head Tank No 2 (with architectural features) of 1.00 lacs gallons capacity with single compartment & 17.00 meters staging eight supported on rectangular/square columns only on turn Key basis at SIDCO Industrial Estate Krandi IGC-Samba Phase - III Including & fixing standard pipeline fittings for inlet, outlet scour & overflow delivering upto 2.00 meters away from RCC outer columns of Over Head Tank, Providing & fixing of all accessories such as lightning arrester, water level indicator, RCC stairs from ground level to tank floor level indicators, RCC stairs from ground level to tank floor level gallery along outside column Gallery to top of dome & inside the Tank with side steel railing, ventilating cowls, Manhole covers with frame & MS railing for stairs & at roof flooring vertical D.I – double flanged pipe of 150mm dia of K-9 make Electro steel, Jindal Electrotherm only pipe line & standard pipe fitting etc all complete. The top water container should be preferable cylindrical In shape, shape, shaft for support shall not be permitted. The foundation, columns bearing etc shall be designed & constructed so as to have the construction of a single storey building between the GL bracing & first bracing with RCC roof slab & brick walls for panel/store accommodation. The position of the bracing shall be so fixed that the height of floor is approximately 3.50 M & the top of ground level bracing is 0.60 M above general ground to provide for plinth. The construction of store/panel room building is also included in the true Key job, the foundation & all other members should be designed & constructed taking into consideration this building load so that this building is constructed for store/panel room including providing & fixing of sal/Deodar wood work three Nos of double door shutters & windows of 2.50 sqm area each at least. The store/panel room should be fully finished including internal electrification as the drawing shall be determined by the tender at his own cost. | 1 | No | 72,25,900 ₹72,25,900 | 66,30,000.01 ₹66,30,000.01 Lowest | 77,50,000 ₹77,50,000 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
12 May 2021, 4:00 pmClosed
ER. AGINDER BAKSHI
O/o EXECUTIVE ENGINEER, CIVIL DIVISION, BARI BRAHMANA
Design, Construction, Testing n Commissioning of RCC Over Head Tank No 2 (with architectural features) of 1.00 lacs gallons capacity with single compartment n 17.00 meters staging eight supported on rectangular/square columns only on turn Key basis
2021_SIDCO_123172_2
E-NIT No. 01 of 2021-22 Dt. 19-04-2021
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
180 days
SAMBA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Yes
EXECUTIVE ENGINEER, CONSTRUCTION DIVISION
₹1.6 L
Yes
19 May 2021
27 Apr 2021
13 May 2021
27 Apr 2021
12 May 2021
27 Apr 2021
Amount
Design, Construction, Testing & Commissioning of RCC Over Head Tank No 2 (with architectural features) of 1.00 lacs gallons capacity with single compartment & 17.00 meters staging eight supported on rectangular/square columns only on turn Key basis at SIDCO Industrial Estate Krandi IGC-Samba Phase - III Including & fixing standard pipeline fittings for inlet, outlet scour & overflow delivering upto 2.00 meters away from RCC outer columns of Over Head Tank, Providing & fixing of all accessories such as lightning arrester, water level indicator, RCC stairs from ground level to tank floor level indicators, RCC stairs from ground level to tank floor level gallery along outside column Gallery to top of dome & inside the Tank with side steel railing, ventilating cowls, Manhole covers with frame & MS railing for stairs & at roof flooring vertical D.I – double flanged pipe of 150mm dia of K-9 make Electro steel, Jindal Electrotherm only pipe line & standard pipe fitting etc all complete. The top water container should be preferable cylindrical In shape, shape, shaft for support shall not be permitted. The foundation, columns bearing etc shall be designed & constructed so as to have the construction of a single storey building between the GL bracing & first bracing with RCC roof slab & brick walls for panel/store accommodation. The position of the bracing shall be so fixed that the height of floor is approximately 3.50 M & the top of ground level bracing is 0.60 M above general ground to provide for plinth. The construction of store/panel room building is also included in the true Key job, the foundation & all other members should be designed & constructed taking into consideration this building load so that this building is constructed for store/panel room including providing & fixing of sal/Deodar wood work three Nos of double door shutters & windows of 2.50 sqm area each at least. The store/panel room should be fully finished including internal electrification as the drawing shall be determined by the tender at his own cost.
RAKESH KUMAR GUPTA
M/S PUSHPINDER SINGH & BROTHERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .