Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.9 LAccepted-AOC AT PO INDUPUR PADMAPUR DIST RAYAGADA | PADMAPUR | RAYAGADA | ODISHA | ₹35.9 L | L1 | Accepted-AOC Winner of transparent lottery |
| 2 | L1₹35.9 LRejected-Finance | ₹35.9 L | L1 | Rejected-Finance Non responsive and looser of lottery |
| 3 | L1₹35.9 LRejected-Finance | ₹35.9 L | L1 | Rejected-Finance Non responsive and looser of lottery |
| 4 | L1₹35.9 LRejected-Finance | ₹35.9 L | L1 | Rejected-Finance Non responsive and looser of lottery |
| 5 | L1₹35.9 LRejected-Finance SRI BONGU TIRUPATI RAO | ₹35.9 L | L1 | Rejected-Finance Non responsive and looser of lottery |
Tender Value
₹42.2 L
EMD Value
₹42,200
Closing Date
5 Jan 2026, 5:30 pmClosed
The Superintending Engineer, GID, PKD
O/o The Superintending Engineer, Gajapati Irrigation Division, Paralakhemundi
Flood protection work to left bank of Ghodasala Nalla at upstream side of culvert near village Tandiguda of R.Udayagiri Block.
2025_CEBMB_123666_8
SE-GID-04/2025-26
National Competitive Bid
Civil Works - Others
330 days
R.UDAYAGIRI
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹42,200
Yes
5 Feb 2026
24 Dec 2025
6 Jan 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
24 Dec 2025 - 30 Dec 2025
Clearing shrub jungles and uprooting stumps and small bushes and trees below 1 M girth and disposing off debris away from the work site, all labour charges, T&P, B & O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge.
Dumping stones for rock toe/ launching appron and packing the same to design thickness and the slopes using 30 cm and above size hard broken stones of approved quality and from approved quarry free from weathered skin and other deleterious materials including filling the interstices with small stones including wedges and packing surface to proper line and levels by manually or mechanically including fixing wave breakers, dewatering if any, complete with all leads, lifts, delfits, T&P , all labour, cost, conveyance, royalty, DMF, EMF, additional charges, cess & taxes of all materials excluding GST etc complete as per direction of the Engineer in charge (Measurement will be taken on finished level section ) only.
Please Enable Macros to View BoQ information
stage.html
html • 0.10 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_572932.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_572932.xls
BOQ • 0.24 MB
DTCN8.pdf
Tender Documents • 2.12 MB
Download all tender documents and submit your bid