Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -5.10% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.0 L+₹10,149.82 (5.35%)Admitted-Fee/PreQual/Technical/Finance | -0.03% | ₹2.0 L+₹10,149.82 (5.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.0 L+₹10,199.82 (5.37%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.0 L+₹10,199.82 (5.37%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance AAGNOO VERINAG | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹2 L
EMD Value
₹6,000
Closing Date
8 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
CONSTRUCTION OF FENCING OF GRAVEYARD NEAR ZIYARAT SHARIEF DAMJAN BLOCK VESSU
2026_RDPR_323185_10
ENIT103of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹6,000
10 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
8 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed | - | Cum | - | - |
| 0.0 | providing and laying of dry stome solling/rbm inc. all carriages | - | cum | - | - |
| 0.0 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) all work upto plinth level | - | Cum | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 Foundations, footings, bases for columns | - | sqm | - | - |
| 0.0 | Structural steel work in single section fixed without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | Kg | 1 | - |
| 0.9 | Structural steel work inTubular section | - | Kg | - | - |
| 0.0 | Providing and fixing G. I. chain link fabric fencing of required width in mesh size 50x50mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete. Made of G. I. wire of dia 4mm | - | sqm | 1 | - |
| 0.0 | P/A of synthtic enamel paint of approved brand over new steel work incl priming coat (2 or more coats). | 1 | sqm | 1 | ₹1 |
| 0.0 | carriage of materials by MT | - | - | - | - |
| 0.0 | sand aggregates for an avg lead of 10kms by mt(sta) | 1 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_1086989.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .