| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹4.1 Cr | L1 | Accepted-AOC After Qualifing the technical bid, M/S S.P.R.U INFRATECH PRIVATE LIMITED is found to be first lowest bidder in finecial bid, Hence Agreement No. 02/SE/2020-21 is done with M/S S.P.R.U INFRATECH PRIVA |
| 2 | L2₹4.1 Cr+₹3.5 L (0.85%)Rejected-AOC | ₹4.1 Cr+₹3.5 L (0.85%) | L2 | Rejected-AOC After Qualifing the technical bid, M/S PRATAP NIRMAN SANSTHAN is found to be Second lowest bidder in finecial bid, Hence disqualifing for the Agreement. |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹8.4 L
Closing Date
7 Jan 2021, 5:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Irrigation Work Circle Obra Sonebhadra 231219
C.C.lining of Sone Pump Canal from Km. 21.065 to 22.947 u/s of (V.R.B).
2020_UPIDC_539932_1
Tender Notice No. 03/SE/2020-21
Open Tender
Civil Works - Canal
Item Wise
330 days
Churk, Sonebhdra
Please Refer Tender Documents
2 documents required · 2 mandatory
₹2,750
₹8.4 L
24 Feb 2021
22 Dec 2020
8 Jan 2021
28 Dec 2020
7 Jan 2021
28 Dec 2020
Amount
Earth work of filling in scoured in inner side of sone pump canal including cost of all labour, material and T&P with manual compaction and derssing required for proper completion of work.
Dismantling stone lining in cement mortar including stacking of materials as directed by Engineer In Charge with in a distance of 60 M including all cost of labour and T&P etc. required for proper completion of work
Dismantling of stone patia in 1:4 CM and staking with 30M lead of Sone Pump Canal including all cost of labour and T&P etc. required for proper completion of work.
80 mm thick Dismantling 1:3:6: C.C. In canal bed of Sone Pump Canal including all cost of labour and T&P etc. required for proper completion of work.
E/W Excavation for sleeper in ordinary soil / sandy loam, clay or sand including lift up to 1.50m and lead up to 30 m and including filling, watering, ramming of excavated earth into the trenches or up to the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer- in -Charge up to a distance of 30 m from the foundation trenches,
Preparation of sub grade before laying of lining excluding cost of earth work. including all cost of labour and T&P etc. required for proper completion of work.
Centering and shuttering of CC work in lining including cost of all labour, material and T & P for proper completion of work as per specification.
Providing and laying of Cement concrete in (1:1.5:3)sleeper & safety ladder with Coarse sand and crushed aggregate size 4.75 mm to 20 mm grite well graded from dalla quarry including cost of all labour, material and T & P, royalty , Taxes etc. required for proper completion of work as per specification
Providing and laying of Coarse sand in filter including cost of all labour, material and T & P, royalty , Taxes for proper completion of work with dewatering if required.
Supplying and laying of 150 micron LDPE film including cost of all labour, material and T & P, required for proper completion of work
Providing and laying of 100 mm thick lining in canal C.C. Cement concrete (1:1.5:3) with Coarse sand and 4.75 mm to 20 mm size crushed aggregate of hard stone ballast well graded from dalla quarry by paver machine including cost of all labour, material and T & P, royalty , Taxes etc. required for proper completion of work as per specification. by Paver machine
Providing and laying of 100 mm thick lining in canal C.C. Cement concrete (1:1.5:3) with Coarse sand and 4.75 mm to 20 mm size crushed aggregate of hard stone ballast well graded from dalla quarry by paver machine including cost of all labour, material and T & P, royalty , Taxes etc. required for proper completion of work as per specification. Without Paver machine in bed & coping
Making contraction groove in lined concrete surface as per drawing including painting with sealing primer on joint and filling groove with sealing compound including cost of all labour, material and T&P, required for proper completion of work.
E/Work in canals with manual compaction and dressing complete in all respect.
Stone boulder pitching on dowla in 1:4 cement and coarse sand mortar including cost of all material labor T&P.including 3.0 m height, lead up to 60 m excluding cost of material etc. required for proper completion
M/S PRATAP NIRMAN SANSTHAN
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .