Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-Finance | ₹3.1 Cr | L1 | Accepted-Finance Bidder Qualified |
| 2 | L2₹3.2 CrAccepted-Finance | ₹3.2 Cr | L2 | Accepted-Finance Bidder Qualified |
| 3 | L3₹3.9 CrAccepted-Finance GM HOUSE F 3 2 OKHLA INDUSTRIAL AREA PHASE I NEW DELHI 110020 | SOUTH | DELHI | 110020 | ₹3.9 Cr | L3 | Accepted-Finance Bidder Qualified |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
19 Jun 2026, 3:00 pmClosed
Superintending Engineer
Office of The Superintending Engineer, Const. Circle, UPJNU, Jhansi
Operation and Maintenance of Jhansi Augmentation Water Supply Scheme (110 mld) and Jhansi-Babina Water Supply Scheme (45 mld) for FY 2026-27
2026_UPJNM_1154977_1
760/W-14/37 Date 27-05-2026
Open Tender
Water Supply
Percentage
304 days
work
Please refer Tender Document
2 documents required · 2 mandatory
₹11,800
Chief Finance and Account Officer,Nagar Nigam
₹10 L
Jhansi
27 Jun 2026
30 May 2026
19 Jun 2026
30 May 2026
19 Jun 2026
30 May 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-A (Civil work) | - | - | - | - |
| 2 | Providing of Skilled Petroling staff for Raw Water Gravity Main pipe line Matateela head work to Babina wtp - 20.0 km approx (1x3= 3 for 304 days @ Rs 423 each for 8 hours for each shift) | - | Days | 1,217.61 | - |
| 3 | Clear Water Gravity Main Babina to Elite Circle Jhansi 27.50 km approx(1x3= 3 for 304 days @ Rs 423 each for 8 hours for each shift) | - | Days | 1,217.61 | - |
| 4 | Cleaning of Algae & other suspended material from Inlet Channel screem , CLF , filter bed , settle water channel by manual labour and Disposal of Algae &other suspended material from Inlet Channel to suitable place With in 8 km for 45 mld .(2x304 day) 8 hours for each shift | - | Days | 405.87 | - |
| 5 | Cleaning of Algae & other suspended material from Inlet Channel screem , CLF , filter bed , settle water channel by manual labour and Disposal of Algae &other suspended material from Inlet Channel to suitable place With in 8 km for 110 mld ..(2x304 days) 8 hours for each shift | - | Days | 405.87 | - |
| 6 | Operation & Maintenance of Laboratory | - | - | - | - |
| 7 | Providing Lab Technicion/chemist (MSC Qualified) for Water test and maintain quality of dinking water as per CPHEEO Manual of turbidity, PH Value of water, Dosing of PAC, Jar test, Chlorine (Pre and Post) etc. at 45 MLD. WTP and 110 MLD. WTP at BABINA . (1x 304 Days) | - | Days | 1,151.4 | - |
| 8 | Providing of labour for collection of water sample from bulk consumer located at different location weekly (2 nos x 4nos x 10months | - | Days | 405.87 | - |
| 9 | Providing of labour for water meater reading and distribution of water bills for bulk consumer located at different location weekly (4 nox10) | - | Days | 405.87 | - |
| 10 | Providing of labour for water meater reading located at Bijoli (2 no x 304 days) | - | Days | 405.87 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.92 MB
BabinaOMTenderDocument_compressed.pdf
Tender Documents • 13.68 MB
BOQ_2163455.xls
BOQ • 0.65 MB
Corrigendum.pdf
PDF • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].