Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance Lowest amt | |
| 2 | L2₹2.0 L+₹1,192.80 (0.60%)Rejected-Finance | L2 | Rejected-Finance High amt | |
| 3 | L3₹2.0 L+₹2,615.20 (1.32%)Rejected-Finance | L3 | Rejected-Finance High amt | |
| 4 | L4₹2.0 L+₹3,791.20 (1.91%)Rejected-Finance 5 B MOTIMANDIR 736 KASBA PETH PUNE 411011 | PUNE | PUNE | MAHARASHTRA | 411011 | L4 | Rejected-Finance High amt | |
| 5 | L5₹2.1 L+₹10,438.40 (5.27%)Rejected-Finance | L5 | Rejected-Finance High amt |
Tender Value
₹2.0 L
Closing Date
9 Dec 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Kashi Prasad GE
No 1, General Bhagat Marg, Pune -40
Repair to ECE elevator lift No-2 MES No 231/7003-LF and OTIS lift No-4 MES No 13780S installed at AICTS under GE (South) Pune.
2021_MES_491747_1
3001/Eqtn/34/E3
Limited
Job Works
Works
30 days
GE (South) Pune
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
11 Dec 2021
2 Dec 2021
10 Dec 2021
3 Dec 2021
9 Dec 2021
3 Dec 2021
60 days
Disconnecting all connections from unserviceable new down collective micro producer auto door control panel and supply and fix in repair new down collective micro producer auto door control panel and testing complete all as specified and directed.
Disconnecting all connections from unserviceable microprocessor base full collective controller for passing on signal to car operating station along with car announciator complete and supply and fix in repair microprocessor base full collective controller for passing on signal to car operating station along with car announicator complete and testing complete all as specified and directed.
Disconnecting unserviceable terminal switch and supply and fix in repair terminal switch complete and testing complete all as specified and directed.
RIYA ENTERPRISES
ZAITUN TRADERS
M/s Green Leaf Electricals
K.K.Enterprises
ALKA TRADERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_549140.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .