| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H4₹534.53−₹1.2 Cr (19.1%)Accepted-AOC | ₹534.53−₹1.2 Cr (19.1%) Quoted ₹5.3 Cr | H4 | Accepted-AOC H4,Awarded |
| 2 | H1₹6.5 CrRejected-Finance | ₹6.5 Cr | H1 | Rejected-Finance H1 |
| 3 | H2₹6.2 Cr−₹36.6 L (5.61%)Rejected-Finance | ₹6.2 Cr−₹36.6 L (5.61%) | H2 | Rejected-Finance H2 |
| 4 | H3₹5.8 Cr−₹73.3 L (11.3%)Rejected-Finance | ₹5.8 Cr−₹73.3 L (11.3%) | H3 | Rejected-Finance H3 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not-Qualified |
| Sl No | Description | Qty | Unit | Shynna Basuk Syiem H4 | RINALDI RYNGKSAI H1 | Phorket Mawlong H3 | NELBI T SANGMA H2 |
|---|---|---|---|---|---|---|---|
| 1.00Clearing and grubbing | |||||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
(100 % of area excluding built-up/ semi built-up area) | 0.14 | ha | 22,996.5 ₹3,219.51 Lowest | 28,423.67 ₹3,979.31 | 25,226 ₹3,531.64 | 26,829.25 ₹3,756.1 |
| 2.00Excavation in Hilly areas in soil by mechanical means | |||||||
| 2.01 | Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 | 1,027.79 | Cum | 102.75 ₹1,05,605.83 Lowest | 127 ₹1,30,529.84 | 115 ₹1,18,196.31 | 119.88 ₹1,23,211.94 |
| 2.02 | Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2. | 333 | Cum | 165.75 ₹55,194.75 Lowest | 204.87 ₹68,221.71 | 185 ₹61,605 | 193.38 ₹64,395.54 |
| 2.03 | Excavation in hilly areas in hard rock requiring blasting, by mechanical means, lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2. | 166.51 | Cum | 338.25 ₹56,321.67 Lowest | 418.08 ₹69,614.08 | 370 ₹61,608.33 | 394.63 ₹65,709.45 |
| 3.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 460.26 | Cum | 166.5 ₹76,633.96 Lowest | 205.79 ₹94,717.73 | 185 ₹85,148.84 | 194.25 ₹89,406.28 |
| 4.00 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 174 | Cum | 494.25 ₹85,999.5 Lowest | 610.89 ₹1,06,294.86 | 840 ₹1,46,160 | 576.63 ₹1,00,333.62 |
| 5.00 | GSB- Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 116.4 | Cum | 2,589.86 ₹3,01,459.7 Lowest | 3,201.07 ₹3,72,604.55 | 2,800 ₹3,25,920 | 3,021.51 ₹3,51,703.76 |
| 6.00 | Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. | 171 | Cum | 3,216.08 ₹5,49,949.68 Lowest | 3,975.07 ₹6,79,736.97 | 3,530 ₹6,03,630 | 3,752.09 ₹6,41,607.39 |
Tender Value
₹7.1 Cr
EMD Value
₹14.2 L
Closing Date
15 Jul 2025, 6:00 pmClosed
Empowered Officer, SRRDA,PMGSY
Office of the Empowered Officer, SRRDA, PMGSY Cell Lower lachumiere, Meghalaya, Shillong - 7930001 0364-2506228/ [email protected]
Construction of RCC Bridge
2025_CEMEG_142129_1
MG070406B14
Open Tender
Civil Works - Bridge Construction
Item Rate
730 days
Nongshillong
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,000
₹14.2 L
Yes
Shillong
18 Nov 2025
24 Jun 2025
16 Jul 2025
24 Jun 2025
15 Jul 2025
24 Jun 2025
24 Jun 2025 - 15 Jul 2025
4 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.32 MB
Tenderdocument.pdf
Tender Documents • 1.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .