Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹311.8 CrAccepted-AOC 47 SECTOR 9 PANCHKULA 134113 HARYANA | PANCHKULA | PANCHKULA | HARYANA | 134113 | ₹311.8 Cr | L1 | Accepted-AOC Accepted L1 Bidder. |
| 2 | L2₹343 Cr+₹31.2 Cr (10.0%)Rejected-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹343 Cr+₹31.2 Cr (10.0%) | L2 | Rejected-Finance Other than L1 Bidder. |
| Sl No | Description | Qty | Unit | SPS Construction India Pvt Ltd L1 | LARSEN AND TOUBRO LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | ‘Construction of (i) Shilpa Setu over river Damodar at 2.950 Km. parallel to the existing Krishak Setu of Burdwan-Arambagh Road (SH-7) and (ii) Construction of Bridge over Eden Canal at 2.415 Km. of Burdwan-Arambagh Road (SH-7) within Burdwan Division, P.W.Dte in the district of Purba Bardhaman in the State of West Bengal under EPC mode of contract' (2nd Call).
Under this agreement, the scope of the project works shall mean and include:-
a) Construction of the aforesaid project on the site set forth in Schedule--A and as specified in Schedule--B together with provision of Project Facilities as specified in Schedule--C, and in conformity with the specifications and Standards set forth in Schedule--D; and
b) Performance and fulfilment of all other obligations of the contractor in accordance with the provisions of this agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the contract under this agreement.
c) Other terms and conditions as per EPC, RFP, NIB documents and corrigendums if any. | 1 | Nos | 3,11,77,00,000 ₹3,11,77,00,000 Lowest | 3,43,00,00,000 ₹3,43,00,00,000 |
Tender Value
₹334.4 Cr
EMD Value
₹3.4 Cr
Closing Date
14 Jan 2026, 3:00 pmClosed
Superintending Engineer and Project Director PIU-I
Office of the Superintending Engineer and Project Director Project Implementation Unit - I,P.W. (Roads) Directorate, 3No. Commissariat Road Hastings Kolkata-700022.
Construction of Shilpa Setu over river Damodar at 2.950 Km parallel to the existing Krishak Setu of Burdwan Arambagh Road SH-7 and Const of Bridge over Eden Canal at 2.415 Km of Burdwan-Arambagh Rd SH-7 within Burdwan Div,PWD WB under EPC 2nd Call
2025_WBPWD_958422_1
WBPWD/PW(R)/SEPD/PIU-I/NIB-05 OF 2025-2026
Open Tender
CIVIL WORKS
Item Rate
913 days
Purba Bardhaman, West Bengal
Please refer Tender documents.
6 documents required · 6 mandatory
₹3.4 Cr
Yes
Bhabani Bhawan,New Building,6th Floor,Kol-27
21 Sept 2026
24 Nov 2025
16 Jan 2026
25 Nov 2025
14 Jan 2026
23 Dec 2025
16 Dec 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .