| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | Rejected-Technical | - | Rejected-Technical BQR not satisfied |
| Sl No | Description | Qty | Unit | MAHI ENVIRO ARCHITECT L1 |
|---|---|---|---|---|
| 1.00 | Chipping and roughening of wall plastering, roof plastering, Floor tiles and removing the debris away from the site including cost of all the materials, labour, lead, lift, etc., complete. | 50 | Sqm | 2,050 ₹2,419 Lowest |
| 2.00 | Dismantling the existing damaged sunshade for the windows and removing the debris away from the site including cost of all the materials, labour, lead, lift, etc., complete. | 6.3 | Sqm | 27,144.81 ₹32,030.88 Lowest |
| 3.00 | Plastering the walls with CM. 1:5 mix 12mm thick with water proofing compound after applying the Epoxy bonding agent for bonding with old cement surface for the chipped wall surface including cost of materials, labour, lead, lift, watering, curing, etc., complete. | 78 | Sqm | 22,152 ₹26,139.36 Lowest |
| 4.00 | Plastering the roof ceiling and lintel beams with CM. 1:3 mix 12mm thick with water proofing compound over the plinth concrete and retaining wall portion including cost of materials, labour, lead, lift, watering, curing, etc., complete. | 30 | Sqm | 9,000 ₹10,620 Lowest |
| 5.00 | Reparing and refixing of the aluminum windows with fixing of pin head glass including cost of all labour, materials, lead, lift etc complete. | 13 | Sqm | 169 ₹199.42 Lowest |
| 6.00 | Painting the ceiling and inner walls and outer walls with two coats of plastic Emulsion paint over a one coat of primer of approved colour and quality including cost of all materials, lead and lift etc., complete | 310 | Rm | 77,190 ₹91,084.2 Lowest |
| 7.00 | Providing Galvalume colour sheet of size 0.47mm for window sunshades including J.Bolts & hooks on roof, frame, labour, cost of all materials, lead, lift etc., complete. | 5 | sqm | 3,600 ₹4,248 Lowest |
| 8.00 | Supply of MS square section pipes to vertical and horizontal support for the fabrication of Galvalume colour sheet of size 0.47mm for window sunshades including cost of all materials, labour, lead, lift, etc., complete. | 217 | kg | 25,417.21 ₹29,992.31 Lowest |
| 9.00 | Supplying, fixing and laying of 110 mm dia PVC pipe 6 Kg/cm2 of ISI brand for sanitary arrangements including cost of all materials labour lead,lift etc complete. | 10 | rm | 7,170 ₹8,460.6 Lowest |
| 10.00 | Pointing the pressed terrace tiles using CM 1:3 mix with water proofing compound including cost of all materials, labour,lead,lift etc, complete.complete. | 16 | sqm | 4,624 ₹5,456.32 Lowest |
Tender Value
₹2.1 L
EMD Value
₹2,100
Closing Date
25 Jul 2025, 2:00 pmClosed
SE/REDC/RMD
SE/REDC/RMD
Improvement work of chipping and replastering the MRT and SPL MTCE Office walls, roof ceiling, repairing the damaged floors, plastering, pointing the roof weathering tiles, colour washing the existing MRT and SPL MTCE offices in Paramakudi
2025_EB_580287_1
ET/C/05/25-26
Open Tender
Civil Works - Buildings
Works
Paramakudi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,100
Yes
12 Aug 2025
10 Jul 2025
26 Jul 2025
10 Jul 2025
25 Jul 2025
10 Jul 2025
Chipping and roughening of wall plastering, roof plastering, Floor tiles and removing the debris away from the site including cost of all the materials, labour, lead, lift, etc., complete.
Dismantling the existing damaged sunshade for the windows and removing the debris away from the site including cost of all the materials, labour, lead, lift, etc., complete.
Plastering the walls with CM. 1:5 mix 12mm thick with water proofing compound after applying the Epoxy bonding agent for bonding with old cement surface for the chipped wall surface including cost of materials, labour, lead, lift, watering, curing, etc., complete.
Plastering the roof ceiling and lintel beams with CM. 1:3 mix 12mm thick with water proofing compound over the plinth concrete and retaining wall portion including cost of materials, labour, lead, lift, watering, curing, etc., complete.
Reparing and refixing of the aluminum windows with fixing of pin head glass including cost of all labour, materials, lead, lift etc complete.
Painting the ceiling and inner walls and outer walls with two coats of plastic Emulsion paint over a one coat of primer of approved colour and quality including cost of all materials, lead and lift etc., complete
Providing Galvalume colour sheet of size 0.47mm for window sunshades including J.Bolts & hooks on roof, frame, labour, cost of all materials, lead, lift etc., complete.
Supply of MS square section pipes to vertical and horizontal support for the fabrication of Galvalume colour sheet of size 0.47mm for window sunshades including cost of all materials, labour, lead, lift, etc., complete.
Supplying, fixing and laying of 110 mm dia PVC pipe 6 Kg/cm2 of ISI brand for sanitary arrangements including cost of all materials labour lead,lift etc complete.
Pointing the pressed terrace tiles using CM 1:3 mix with water proofing compound including cost of all materials, labour,lead,lift etc, complete.complete.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .