Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹1.9 L (1.51%)Admitted-Finance BARABANKI | UTTAR PRADESH | 225001 | ₹1.3 Cr+₹1.9 L (1.51%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹7.5 L (6.05%)Admitted-Finance 234 Z 12 VAISHNO COLONY SURENDRA NAGAR ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.3 Cr+₹7.5 L (6.05%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹11.4 L (9.16%)Admitted-Finance | ₹1.4 Cr+₹11.4 L (9.16%) | L4 | Admitted-Finance |
| 5 | L5₹1.4 Cr+₹14.6 L (11.7%)Admitted-Finance | ₹1.4 Cr+₹14.6 L (11.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S K P CONTRACTOR L1 | S R Contractor L4 | M/S HARENDRA SINGH L3 | chetan associates L6 | M/S SATISH KUMAR L2 | M/S FAROOQ KHAN L5 | M/S JAIN BROTHERS L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply and stacking of 22.4-53 mm guage hard stone ballast for Top coat, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pothols & undulations | 1,240.8 | cum | 2,112.02 ₹26,20,594.42 | 2,800 ₹34,74,240 | 2,300 ₹28,53,840 | 2,500 ₹31,02,000 | 2,106.11 ₹26,13,261.29 Lowest | 2,359.8 ₹29,28,039.84 | 3,200 ₹39,70,560 |
| 2.00 | Same as Item No. 1 above but Crushed stone dust of approved quality and quarry. | 248.16 | cum | 2,319.48 ₹5,75,602.16 | 2,800 ₹6,94,848 | 2,410 ₹5,98,065.6 | 2,700 ₹6,70,032 | 2,313 ₹5,73,994.08 Lowest | 2,591.6 ₹6,43,131.46 | 2,500 ₹6,20,400 |
| 3.00 | Consolidation of 22.4-53mm gauge stobe ballast | 1,240.8 | cum | 366.9 ₹4,55,249.52 | 175 ₹2,17,140 Lowest | 390 ₹4,83,912 | 390 ₹4,83,912 | 365.92 ₹4,54,033.54 | 410 ₹5,08,728 | 300 ₹3,72,240 |
| 4.00 | Water allowance for consolidation of stone ballast to be allowed on item No. 1 between 15th Nov to 31st May | 1,240.8 | cum | 18.5 ₹22,954.8 Lowest | 30 ₹37,224 | 21 ₹26,056.8 | 20 ₹24,816 | 20.49 ₹25,423.99 | 21 ₹26,056.8 | 50 ₹62,040 |
| 5.00 | Bitumin Painting over W.B.M. surface (Ist Coat Painting) including supply of 13.2mm guage stone grit and bitumin including maintenance of stone grit and bitumin including maintenance of road side patries & watering them during operation for proper completion of work as directed by the Engineer in charge & also including road roller charges and its fuel, the wages of fireman and T&P etc required for proper copletion of the work as per direction of Engineer in charge, including cost of tack coat (Bitumen shall be used @ 0.60kg/sqm) | 12,408.05 | sqm | 171.66 ₹21,29,965.86 | 125 ₹15,51,006.25 Lowest | 181 ₹22,45,857.05 | 190 ₹23,57,529.5 | 186.97 ₹23,19,933.11 | 191.8 ₹23,79,863.99 | 223 ₹27,66,995.15 |
| 6.00 | Providing and laying semi-dense buituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler , transporting the hot mix to work site by tipper , laying with paver finisher equiped with electronic sensor to the required grade , level and alignment and rolling with smooth wheeled , vibratory and tandem rollers to achieve the desired compaction and density as per specification , complete and as per directions of engineer-in-charge.40mm completed thickness with bitumen og grade VG-30@ 5%( percentage by weight of total mix ) and lime filler @ 2% ( percentage by weight of aggegate ) prepared in batch type hot mix plant of 100-120 TPH capacity. | 10,483.31 | sqm | 441.2 ₹46,25,236.37 | 340 ₹35,64,325.4 Lowest | 452 ₹47,38,456.12 | 490 ₹51,36,821.9 | 480.97 ₹50,42,157.61 | 493 ₹51,68,271.83 | 625 ₹65,52,068.75 |
| 7.00 | Brick edging on both sides of the road with Ist class bricks 8cm wide & 12cm deep laid with mud mortar including labour, & supply of bricks finished to required level & in proper alignment & also including dressing & ramming the excavated earth as directed by Engineer in charge including supply of all material labour & T&P etc required for proper completion of the work. | 6,486.18 | Rm | 71 ₹4,60,518.78 Lowest | 250 ₹16,21,545 | 80 ₹5,18,894.4 | 90 ₹5,83,756.2 | 78.06 ₹5,06,311.21 | 80 ₹5,18,894.4 | 90 ₹5,83,756.2 |
| 8.00 | Providing and laying of 2.5mm thick road marking strips (retroreflective) of specified shade/colour using hot thermoplastic material by fully/semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shose heater driven by experienced operator on road surface including cost of material labour T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc, complete as per direction of Engineer-in-charge and accordance with applicable specifications. | 648.62 | sqm | 553.11 ₹3,58,758.21 | 400 ₹2,59,448 Lowest | 618 ₹4,00,847.16 | 650 ₹4,21,603 | 450 ₹2,91,879 | 618 ₹4,00,847.16 | 650 ₹4,21,603 |
| 9.00 | Providing & applying VG-10 Tack Coat with bitumen using emulsion pressure distributer at the rate of 0.30kg/sqm on the prepared surface/granular surface cleaned with mechanical brooms. (503) (iii) on WBM | 10,483.31 | SQM | 15.5 ₹1,62,491.31 Lowest | 25 ₹2,62,082.75 | 17.1 ₹1,79,264.6 | 18 ₹1,88,699.58 | 16.68 ₹1,74,861.61 | 17.1 ₹1,79,264.6 | 20 ₹2,09,666.2 |
| 10.00 | Cleaning Jungles including uprooting oftrunk vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50 meters out side the periphery of area cleared.Same as Above Item 259 But Grass only (259a) | 25,649.25 | SQM | 2.8 ₹71,817.9 Lowest | 15 ₹3,84,738.75 | 3 ₹76,947.75 | 3 ₹76,947.75 | 2.92 ₹74,895.81 | 3 ₹76,947.75 | 4 ₹1,02,597 |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
1 Feb 2023, 5:00 pmClosed
PGM (E)
A-1/4 Upsida Complex, Lakhanpur, Kanpur
Upgradation of Roads in Housing Sector at I.A Talanagri Distt. Aligarh
2023_SIDC_769236_1
cd_4_174_dt_23112022
Open Tender
Civil Works
Item Rate
90 days
Talanagri
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,909
UPSIDA
₹3.3 L
2 Mar 2023
25 Jan 2023
2 Feb 2023
25 Jan 2023
1 Feb 2023
25 Jan 2023
Amount
Supply and stacking of 22.4-53 mm guage hard stone ballast for Top coat, from approved quarry including royalty, cartage, octroi, sales tax & all other taxes whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer incharge in dipretions, leaks, pothols & undulations
Same as Item No. 1 above but Crushed stone dust of approved quality and quarry.
Consolidation of 22.4-53mm gauge stobe ballast
Water allowance for consolidation of stone ballast to be allowed on item No. 1 between 15th Nov to 31st May
Bitumin Painting over W.B.M. surface (Ist Coat Painting) including supply of 13.2mm guage stone grit and bitumin including maintenance of stone grit and bitumin including maintenance of road side patries & watering them during operation for proper completion of work as directed by the Engineer in charge & also including road roller charges and its fuel, the wages of fireman and T&P etc required for proper copletion of the work as per direction of Engineer in charge, including cost of tack coat (Bitumen shall be used @ 0.60kg/sqm)
Providing and laying semi-dense buituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler , transporting the hot mix to work site by tipper , laying with paver finisher equiped with electronic sensor to the required grade , level and alignment and rolling with smooth wheeled , vibratory and tandem rollers to achieve the desired compaction and density as per specification , complete and as per directions of engineer-in-charge.40mm completed thickness with bitumen og grade VG-30@ 5%( percentage by weight of total mix ) and lime filler @ 2% ( percentage by weight of aggegate ) prepared in batch type hot mix plant of 100-120 TPH capacity.
Brick edging on both sides of the road with Ist class bricks 8cm wide & 12cm deep laid with mud mortar including labour, & supply of bricks finished to required level & in proper alignment & also including dressing & ramming the excavated earth as directed by Engineer in charge including supply of all material labour & T&P etc required for proper completion of the work.
Providing and laying of 2.5mm thick road marking strips (retroreflective) of specified shade/colour using hot thermoplastic material by fully/semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shose heater driven by experienced operator on road surface including cost of material labour T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc, complete as per direction of Engineer-in-charge and accordance with applicable specifications.
Providing & applying VG-10 Tack Coat with bitumen using emulsion pressure distributer at the rate of 0.30kg/sqm on the prepared surface/granular surface cleaned with mechanical brooms. (503) (iii) on WBM
Cleaning Jungles including uprooting oftrunk vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50 meters out side the periphery of area cleared.Same as Above Item 259 But Grass only (259a)
Excavating, supplying and filling of local earth by mechanical transport upto a lead upto 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
M/S SATISH KUMAR
M/S HARENDRA SINGH
S R Contractor
M/S FAROOQ KHAN
chetan associates
M/S JAIN BROTHERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
capabilitystatement.pdf
Tender Documents • 0.43 MB
etenderdocument.pdf
Tender Documents • 1.18 MB
feeformatn.xls
Tender Documents • 0.02 MB
BOQ_1269145.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .