Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
26 Nov 2026, 2:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CE/TPSO/MDU
CE/TPSO/MDU
Erection of 110 KV DC line by making LILO the proposed Kethaiyurambu 110/22 KV SS
2026_EB_725025_1
CE/TPSO/MDU/019/26-27
Open Tender
Civil Works - Others
Works
180 days
Dindigul
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 L
Yes
11 Nov 2026
11 Nov 2026
27 Nov 2026
11 Nov 2026
26 Nov 2026
16 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing juliflora jungle with uprooting including cost of clearing away the site with all labour, lead, lift , T&P etc complete. | 5,137 | sqm | - | - |
| 2 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | 7 | Loc | - | - |
| 3 | Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete. | 452 | cum | - | - |
| 4 | Earthwork excavation in soft disintegrated rock or kankar not requiring blasting inlcuding all cost of lead lift etc complete. | 452 | cum | - | - |
| 5 | Transport of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. For KCR Tower | 5 | Loc | - | - |
| 6 | Transport of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. For HCR Tower | 2 | Loc | - | - |
| 7 | PCC 1:2:4 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete. | 18 | cum | - | - |
| 8 | PCC 1:2:4 using 20mm metal for foundation and chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift ,frustum box ,chimney box, etc complete . | 163 | cum | - | - |
| 9 | Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. | 723 | Cum | - | - |
| 10 | Supply & Providing pipe type earthing including all cost of materials, lead, lift etc complete. | 6 | loc | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_870391.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .