Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | -38.00% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L2₹5.9 LAdmitted-Finance | -25.50% | ₹5.9 L | L2 | Admitted-Finance |
| 3 | L3₹6.0 LAdmitted-Finance | -23.62% | ₹6.0 L | L3 | Admitted-Finance |
| 4 | L4₹6.1 LAdmitted-Finance | -22.25% | ₹6.1 L | L4 | Admitted-Finance |
| 5 | L5₹6.4 LAdmitted-Finance | -17.99% | ₹6.4 L | L5 | Admitted-Finance |
Tender Value
₹7.8 L
EMD Value
₹15,700
Closing Date
6 May 2026, 6:00 pmClosed
EXECUTIVE ENGINEER-III
UDA Office Udaipur
Construction of Boundary Wall at Chitrakoot Nagar Kabristan near Old Slurry Dumping Yard. 0803
2026_UITUD_553427_1
NIT_08_03
Open Tender
Civil Works
30 days
Udaipur
Please Refer Tender Document
2 documents required · 2 mandatory
₹590
Refer Tender Document
₹15,700
Yes
7 May 2026
21 Apr 2026
7 May 2026
21 Apr 2026
6 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Item Code [2022 1.8 EW]:Item Type [building] :: Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | - | CUM | - | - | |
Item Code [2022 12.2.2 new]:Item Type [building] :: Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 20 mm | - | Sqm | - | - | |
Item Code [2022 3.1.6]:Item Type [building] :: Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | CUM | - | - | |
Item Code [2022 3.7.1 new]:Item Type [building] :: Providing and laying damp-proof course with cement concrete grade M-150 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification .50 mm thick. | - | Sqm | - | - | |
Item Code [2022 6.1.6 SM 1:6]:Item Type [building] :: Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | - | CUM | - | - | |
Item Code [2022 6.2.4 SM Sup]:Item Type [building] :: Random Rubble stone masonary for superstructure above plinth level one storey height above 30 cm. thick walls in :
Cement Mortar 1:4 ( 1-Cement : 4-Sand). | - | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_985856.xls
BOQ • 0.33 MB
General_Conditions2025.pdf
Tender Documents • 1.03 MB
Download all tender documents and submit your bid