Loading…
Loading…
Tender Value
₹1.3 L
EMD Value
₹2,600
Closing Date
10 Jun 2026, 4:00 pm4d left
Executive Engineer RnB Division Budgam
Engineering Complex Budgam
Construction of P Wall near the house of Fayaz Ahmad Dar at Al Noor Colony Narakara Budgam
2026_PWDJK_311430_6
NIT_No_23_DB_2026-27
Open Tender
Civil Works
20 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Budgam
₹2,600
4 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
10 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 6.84 | CUM | 256.85 | ₹1,756.85 | BI01010001010000000000000515BI0100001113 |
| 2 | P/L dry Stone Soling duly hand packed consolidated with hand rammers incl.all (Quarry)Job.carriage complete | 1.14 | Cum | 1,000 | ₹1,140 | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 cement : 4coarse sand : 8 graded cum stone aggregate 40 mm nominal size) PCC below Foundation& rooms-Mudmat including carriage | 0.86 | CUM | 5,202.9 | ₹4,474.49 | BI01010001010000000000000515BI0100001115 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, including curing but excluding the cost of centering, shuttering, finishing and reinforcement. - All work cum upto plinth level 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 13.5 | cum | 6,591.25 | ₹88,981.88 | BI01010001010000000000000515BI0100001118 |
| 5 | Centering and shuttering including strutting,propping etc and removal of formwork Foundations, footings, bases for columns | 56 | SQM | 286.35 | ₹16,035.6 | BI01010001010000000000000515BI0100001119 |
| 6 | Supply and filling of nallah boulders/GSB behind Rwall incl carriages | 7.7 | Cum | 1,000 | ₹7,700 | BI01010001010000000000000515BI0100001125 |
| 7Carriage of materials from Mechanical transport from source to site of work | ||||||
| 7.01 | sand with 20kms lead | 6.07 | CUM | 409.94 | ₹2,488.34 | BI01010001010000000000000515BI0100001129 |
| 7.02 | aggregates with 20km lead | 18.2 | CUM | 409.94 | ₹7,460.91 | BI01010001010000000000000515BI0100001132 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_1008580.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid