| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 LRejected-Finance | ₹3.3 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | THANKIAHNADAR NESAMONY L2 | S CHELLAM L1 |
|---|---|---|---|---|---|
| 1.00Providing Paver Block Arrangements | |||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 9 | m3 | 112.2 ₹1,009.80 | 109.62 ₹986.58 |
| 1.02 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) | 3 | m3 | 5,525.8 ₹16,577.40 | 5,398.49 ₹16,195.47 |
| 1.03 | Providing steel centering for sides and soffits including supports and strutting upto 1:10/1:20 up to 3.29m height for plain surfaces such as RCC slabs, rectangular beams, Tee beams, bed blocks, Culvert body walls, deck slabs, retaining walls, staircase, Landing slab, landing beams, canopy etc., wood) joists of size 10cmx 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 15cm c/c including cost of nails, ropes, all labour charges and incidental charges etc. complete complying with standard specification.(TNBP Spl. No.154 A) | 6 | m2 | 643.67 ₹3,862.02 | 628.84 ₹3,773.04 |
| 1.04 | Laying Plain cement concrete 1:2:4 (One cement,two sand and four aggregates) using 20mm ISS Hard broken granite stone jelly for plain cement concrete works excluding cost of shuttering, and centering including all labour charges and incidental charges for cost and conveyance of all materials to work site, mixing and laying concrete finishing the surface nearly rough, compacting using vibrators, curing etc, complete complying with standard specification.(TNBP No.28) | 6 | m3 | 6,855.88 ₹41,135.28 | 6,697.92 ₹40,187.52 |
| 1.05 | Supplying and laying interlocking Paver block Stone of 83mm thick Over a base layer of crushed stone sand filling incl.Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers. | 171 | m2 | 1,553.41 ₹2.7 L | 1,517.62 ₹2.6 L |
Tender Value
Refer Docs
EMD Value
₹3,900
Closing Date
22 Jan 2026, 3:00 pmClosed
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Providing Paver Block Arrangements at Kaliyankadu Govt Middle School Campus Pathway in Ward No.6
2026_MAWS_641059_1
445/2025-26/AEE
Open Tender
Civil Works
90 days
Nagercoil Corporation Providing Paver Block Arrang
Registered Contractor
3 documents required · 3 mandatory
₹0
₹3,900
5 Jun 2026
9 Jan 2026
22 Jan 2026
9 Jan 2026
22 Jan 2026
9 Jan 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28)
Providing steel centering for sides and soffits including supports and strutting upto 1:10/1:20 up to 3.29m height for plain surfaces such as RCC slabs, rectangular beams, Tee beams, bed blocks, Culvert body walls, deck slabs, retaining walls, staircase, Landing slab, landing beams, canopy etc., wood) joists of size 10cmx 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 15cm c/c including cost of nails, ropes, all labour charges and incidental charges etc. complete complying with standard specification.(TNBP Spl. No.154 A)
Laying Plain cement concrete 1:2:4 (One cement,two sand and four aggregates) using 20mm ISS Hard broken granite stone jelly for plain cement concrete works excluding cost of shuttering, and centering including all labour charges and incidental charges for cost and conveyance of all materials to work site, mixing and laying concrete finishing the surface nearly rough, compacting using vibrators, curing etc, complete complying with standard specification.(TNBP No.28)
Supplying and laying interlocking Paver block Stone of 83mm thick Over a base layer of crushed stone sand filling incl.Cost of materials laying and Labour charges etc complete complying with the standard specification and as directed by the departmental officers.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_767759.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
BOQ_767759.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid