Tender Value
₹17.7 L
EMD Value
₹17,736
Closing Date
28 Jul 2026, 5:00 pmClosed
Executive Officer, Talacher Municipality
At/Po- Talacher Town, Dist.- Anugola
Construction of Water Font Development at Maa Manima Pond under Talacher Municipality in W.No.6
2026_ORULB_136208_15
TCRM - 9 / 2026-27
Open Tender
Civil Works - Others
Percentage
60 days
Talacher Municipal Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹17,736
Yes
16 Aug 2026
18 Jul 2026
29 Jul 2026
18 Jul 2026
28 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kind of soil including dressing and leveling the bed and depositing the soil with intial lead and lift etc complete. | 1 | cum | 299.53 | ₹299.23 |
| 2 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of as per the direction of Engineer-In-Charge. | 1 | cum | 725.95 | ₹725.22 |
| 3 | Supplying all materials, labour, T&P for Providing, base layer of GSB/WBM / WMM / Crushed Rock / Soil-Cement laying 200mm thickness, Spreading and Compacting coarse graded stone aggregate to wet mix macadam( WMM) spacification, Grade -IV and Spreading in uniform Layers by mechanical means on preparaed and compacted earth surface, Mixing by mix in place Method with rotovator at OMC and Compacting and rolling by vibratory roller to achive the desired compaction etc complete as per the direction of the Engineer In Charge. (Parking lot) | - | cum | 2,920.6 | - |
| 4 | Providing cement concrete for unreinforced cement concrete works of proportion (1:3:6) with 40mm size crusher broken hard granite (CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading and unloading) & equipments for handing, transportation, batching, mixing, placing in position vibrating, curing for __ days complete as per specification drawing and direction of the Engineer-in-charge. | 1 | cum | 5,989.99 | ₹5,984 |
| 5 | Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) brick masonary in F&P. | - | cum | 5,525.28 | - |
| 6 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour (A) COLUMN BASE | 1 | cum | 6,039.72 | ₹6,033.68 |
| 7 | (B) COLUMN (GAZEBO) | 1 | cum | 8,593.82 | ₹8,585.23 |
| 8 | (C) RCC COLUMN (GAZEBO) | - | sqm | 20,478.38 | - |
| 9 | Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate).@1 qntl/cum of RCC quantity in iteam no.5. | 1 | qntl. | 8,530.25 | ₹8,521.72 |
| 10 | Rigid and smooth centering and shuttering for RCC work (A) Plinth Band column footing | 1 | sqm | 248.67 | ₹248.42 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_602129.xls
BOQ • 0.36 MB
DTCN9.pdf
Tender Documents • 0.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].