Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC BHIWANI HARYANA | BHIWANI | HARYANA | 127021 | ₹1.8 L | L1 | Accepted-AOC ok |
| 2 | L2₹1.9 LRejected-Finance GALI NO 5 SUNAROWALI VINOD NAGAR MILL GATE HISAR | ₹1.9 L | L2 | Rejected-Finance ok |
| 3 | L3₹2.0 LRejected-Finance 2214 URBAN ESTATE JIND | JIND | HARYANA | 126101 | ₹2.0 L | L3 | Rejected-Finance ok |
| 4 | L4₹2.0 LRejected-Finance | ₹2.0 L | L4 | Rejected-Finance ok |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
2 Mar 2026, 9:00 amClosed
BHUPENDER SINGH
DIV 1 Hissar
A/mtc estimate for roads in sector- 1and4 Hisar for the year 2025-2026.
2026_HBC_504830_1
20262C5D94B9 F6A6 4BCC 87E4 EDF78C00416E259HSV
Open Tender
Civil Works
60 days
Hisar
Construction of New Slab at Storm Water Drains at various locations in Sector-4P, Hisar and all others works contingent thereto
2 documents required · 2 mandatory
₹250
Yes
₹4,000
Yes
17 Apr 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
[6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform
[6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_583551.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_583551.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid