Mandatory Documents
RequiredEMD along-with Proforma A
RequiredCertificate / License of Lift Manufacturer from Competent Authority of Government and Valid Electrical Contractor License.
RequiredCertificate of eligible similar nature of works satisfactorily completed during the last seven years ending previous month of last day of submission of tenders should have been issued by an officer not below the rank of Executive Engineer / Project manager or equivalent. (To avoid delays in getting the completion cost verification from the project authorities, TDS certificate including BOQ of Final bill is desired, but not essential for tendering purposes. Full credentials of the project authori
RequiredBank Solvency Certificate OR Net worth Certificate certified by the Chartered Accountant with Unique Document Identification Number.
RequiredTechnical Data Sheets / Test Reports of Governor / Steel Ropes / Drive / Controller /Motor.
RequiredAll undertakings by the intending bidders shall be on nonjudicial stamp paper of minimum Rs. 100 to comply with
RequiredBIS standards, Quality standards to latest IS/ISO-9001 2015 and Public Procurement (Preference to Make in India), Order 2017 (as amended from time to time).
RequiredAvailability of spares for healthy functioning of the equipments in Service Centre at Mumbai for Comprehensive Maintenance and Repair of Lifts for the entire expected life of the lift i e 20 years and supply proprietary / OEM items of lift to Client on demand on cost basis in case of non- existence of Comprehensive Annual maintenance contract.
RequiredThe complete lift installation including its components, safety devices, various types of controls etc., testing, inspection, operation and maintenance shall conform to relevant Codes, Standards, code of practices, guidelines, safety rules, inspection manual(s), rules issued by Bureau of Indian Standards, as amended up to the last date of receipt of tenders.
RequiredThe down time of installed lifts being maintained by the manufacturer shall not be more than 8 hours (average) in case of minor faults and 7 days (average) in case of major faults during the last one financial year.
RequiredOfficers of the department may conduct inspection before dispatch of equipments/ materials at manufacturers works. The contractor shall arrange facilities for inspection of equipments/ materials including witness conducting the required tests as per CPWD Specifications and relevant BIS codes in the manufacturing unit.
RequiredAn undertaking that Annual Comprehensive Maintenance shall be carried out after the Free Maintenance for guarantee period of 1- year as per Schedule of work, indicated rates and terms and conditions through Supplementary agreement on chargeable basis for the balance expected life of the lift i. e. 1-19 Years.
RequiredGST Registration Certificate.
RequiredProforma-B- Certificates as per NIT