Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
7 Sept 2026, 4:00 pm
Executive Engineer REW Leh
REW Leh
Construction of Community gathering center at Sasoma (under district Capex)
2026_RDD_19373_1
33- UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
180 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,185
Payable To Executive Engineer REW Leh
₹2.4 L
17 Aug 2026
17 Aug 2026
9 Sept 2026
17 Aug 2026
7 Sept 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed:
All kinds of soil | - | cum | 208.42 | - |
| 2 | Providing and laying dry stone pitching in horizontal level including cost of stone complete job | - | cum | 953.03 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) : | - | cum | 5,725.33 | - |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | - | cum | 5,730.39 | - |
| 5 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4
(1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone
aggregate 12.5mm nominal size derived from natural sources) | 58.53 | SQM | 402.43 | ₹23,554.36 |
| 6 | Providing & fixing upto floor five level compressed stabilized earth blocks (CEB)
made an appropriate mix of dry inorganic subsoil, non-expansive clay, sand, and
aggregate with 5% cement as stabilizer, in mud mortar, including cost of materials
complete. | 98.27 | cum | 8,836.64 | ₹8,68,377.01 |
| 7 | Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominal | - | cum | 14,111.48 | - |
| 8 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 124.12 | cum | 11,102.31 | ₹13,78,018.72 |
| 9 | Steel reinforcement for R.C.C work including straightening cutting, bending, placing position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 13,653.18 | KG | 109.33 | ₹14,92,709 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 76.92 | sqm | 306.15 | ₹23,549.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_45998.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].