Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹6,340
Closing Date
16 Nov 2026, 11:00 am5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
JSV Arki
R_M of LIS Scheme Nouni Manjhyar in GP Maan Tehsil Arki District Solan HP SH- Providing laying and jointing HDPE pipe line and construction of RCC out let chamber 5 Nos. to leftout village Panan under DMFT
2026_HPIPH_147332_8
ARK-SOL01-425-8213-63
Open Tender
Civil Works
Item Rate
90 days
Arki
Please refer Tender documents.
4 documents required · 4 mandatory
₹350
₹6,340
6 Nov 2026
6 Nov 2026
16 Nov 2026
6 Nov 2026
16 Nov 2026
6 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation drain & channels etc. earth all classification of earth work such as pick work jumper work pumping out water blasting softs /hard work in all same where blasting is prohibited in all leads and lifts including trimming and dressing of sides, leveling of beds to correct grade including shoring strutting, planking , timbering and dewatering wherever required , stacking usable and unusable material/ soil separately and after laying jointing and testing pipes, returning the usable soil in 15 Cm layers by ramming and watering and then desposing off all surplus excavated soil/ unusable material as directed within all leads and lifts including restoration of unmateled/ mateled surfaces top its orinal condition including cost of diversion of of trafffic, night signal boards, fixing of caution boards, crossing over trenches for acces to houses, fencuing etc. complete in all respects within all leads and lifts as per the directions of Engineer in Charge. | 140 | Per Cubic meter. | 1.25 | ₹175 |
| 2Providing laying & jointing high density polyethylene pipe with fussion welding process for buried water means and services duly ISI marked (IS-4984-1995) as amended upto date in the following dia material grade PE-100 pressure raiting of various dia including all leads and lifts carriage of materials at site as directed by the Engineer-in charge | |||||
| 2.01 | HDPE pipe, PN-4.0, Pipe grade PE-80, Pipe dia 90 mm | 560 | Per running meter | 1.25 | ₹700 |
| 3 | Excavation in foundation, trenches etc. earth work in all type of soil such as pick work, jumper work, blasting work kankar,moorum singles including decomposed soft and hard rock etc. upto all heights stacking the excavated earth not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths and sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth upto all leads and lifts as directed by the Engineer in charge complete in all respects. | 8.2 | Per Cubic Meters. | 1.25 | ₹10.25 |
| 4 | Providing and laying cement concrete 1:4:8(1 Cement :4 Sand : 8 graded stone aggregate 40mm nominal size)and curing complete excluding the cost of form work in foundation and plinth including all carriage of materials upto all leads and lifts complete in all respects. | 1.37 | Per Cubic Meter | 1.25 | ₹1.71 |
| 5Providing and laying cement concrete 1:1½:3 (1 cement: 1½ sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in. | |||||
| 5.01 | Foundation and plinth complete in all respects. | 1.37 | Per Cubic Meter. | 1.25 | ₹1.71 |
| 5.02 | Walls any thickness (but not less than 0.10meter thickness including attached pilasters,buttresses plinth and string courses etc. from top of foundationlevel upto floor two level including all leads and lifts etc.complete in all respects | 2.84 | Per Cubic meter | 1.25 | ₹3.55 |
| 6Providing form work with mild steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu reinforced concrete work and plain concrete work in :- | |||||
| 6.01 | Vertical surfaces such as walls(any thickness )partition and the like including attached pillasters, buttresses plinth and string courses and like including all leads and lifts etc. complete in all respects. | 37.8 | Per Square Meter. | 1.25 | ₹47.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
TERM_condition_Job_8.pdf
Tender Documents • 0.15 MB
FORM_6_Job_8.pdf
Tender Documents • 0.11 MB
FORM_8_Job_8.pdf
Tender Documents • 1.48 MB
BOQ_219937.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .