Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.6 LAccepted-Finance 2 112 SRI LAKSHMI NAGAR SIDHANAIKANPALAYAM SULUR 641658 | COIMBATORE | TAMIL NADU | 641658 | ₹12.6 L | 1 | Accepted-Finance Low Bid Quantity Amount |
| 2 | 2₹12.8 LRejected-Finance | ₹12.8 L | 2 | Rejected-Finance High Bid Quantity Amount |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
9 Oct 2024, 3:00 pmClosed
Panchayat President
Panchayat President, Peedampalli Panchayat Office, Sulur Block
Construction of 1,00,000 Ltrs Capacity Sump Jayajothi nagar at Peedampalli H/o Peedampalli Panchayat
2024_RDTN_488258_1
01/2024/Peedampalli
Open Tender
Civil Works
Works
180 days
work
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
10 Oct 2024
26 Sept 2024
9 Oct 2024
26 Sept 2024
9 Oct 2024
26 Sept 2024
Amount
Earthwork excavation in sand, siit other loose soil wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth etc. with an initial lead of 10m and lift of 2m. and as directed by TWAD BOARD Officers.For Foundation
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc., with an initial lead of 10m and lift of 2m. and as directed by TWAD BOARD Officers. For Foundation First depth of 0 to 2 m
a.For SDR (2 nd Depth of 2m to 3m
b. For DMR not Requiring Blasting
Levelling coarse in cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials, mixing,placing, ramming, curing, finishing etc., complete and as directed by TWAD BOARD Officers.
PCC Laying (beyond 1.5 m from GL)
Reinforced Cement ConcreteM30 using Machine crushed HBG stone for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by TWAD Board Officers.
cum Beyond 1.50 m & upto 4.50 m below GL
Reinforced Cement Concrete M30 using Machine crushed HBG stone for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by TWAD Board Officers.
a.Upto 1.50 m Below GL
b.Upto 4.50 m above GL from GL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm 13cm spaced at 75cm c/c etc., complete and as directed by TWAD Board Officers.
a.For 0.00 to 3.30 M (Plane Surface)
b.For 0.00 to 3.30 M (Curved Surface) For 0.00 to 3.30 M (FOR ROUND COLUMN)
c.FOR CIRCULAR COLUMN
d.For 3.30 M-4.3 M (Plane Surface)
Supplying, fabricating and placing in position of RTS rods for reinforcement including cost of steel and binding wire, labour charges etc., complete for RCC works and as directed by TWAD Board Officers. For RCC Works
Upto 16 mm dia
Supply, Delivery and fixing of CI Manhole frame with cover of following size including cost of all materials, fixing of MS clamps, Bolt and nuts etc., complete and as directed by TWAD Board Officers. Size 0.60 m * 0.60 m
Painting two coats with best Emulsion paint including all cost of Materials & labour charges etc. complete.and as directed by TWAD Board Officers.
Supplying and fixing in position of RCC (1:1.5:3) in side access lader of following size using 20mm size HBS jelly including cost of all materials, centring, shuttering, strutting, fabrication and placing in position of reinforcement, finishing, curing etc., complete and as directed by TWAD Board Officers
Provision for supply & fixing of MS ladder including all cost of Materials & labour charges etc. complete.and as directed MS Ladder
Refilling the foundation with excavatedSoil (other than sand) in layers of notmore than 15cm thick, watering, wel Iramming, consolidating, complying with standard specification and as directed by TWAD Board Officers.
Earth work excavation in all strata for laying pipes including refillinig charges etc. complete as directed by TWAD Bd officers
Refilling with excavated earth including consolidatin etc. compete as directed by TWAD Bd officers
Provision for Cost and supply of 75 mm 6KSC Pipes etc.,
Provision for Laying and jointing of PVC Pipes etc., P280/11b(1))
Provision for Cost and supply 10.0.HP Openwell Submersible Motor (75LPM x 125m head)
Provision for Cost and supply 10.0.HP Panel Board
Provision for 10.0HP Submersible Motor Erection Charge etc
Provision for 65 mm Gl Pipe etc.,
Provision for4 Sq.mm 3 Core Flat Cable etc.,
Provision for 65 mm GM Gate Value etc. 46-5-2
Provision for M S Kiosk box including, labour charges etc. complete.and as directed
Provision for Cement Bed including, labour charges etc. complete.and as directed
Provision for Name Board Charges etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
THULASI BUILDERS (BID ID -1160769)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].