| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.8 LAccepted-Finance | L1 | Accepted-Finance Low rate | |
| 2 | L2₹32.2 L+₹38,969.86 (1.22%)Rejected-Finance | L2 | Rejected-Finance High rate |
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
3 Oct 2026, 2:00 pmClosed
EE PD PWD BAGHPAT
EE PD PWD BAGHPAT
Construction of Additional Rooms Junior Engineer Room and Office Assistants Room in the office of Executive Engineer, Provincial Division, PWD, Bagpat in district Bagpat in the financial year 2026-27.
2026_CEMRT_1190307_1
2122/3A Date 25-08-2026
Open Tender
Civil Works - Buildings
Percentage
180 days
EE PD PWD BAGHPAT
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹3.4 L
EE PD PWD BAGHPAT
9 Oct 2026
26 Sept 2026
3 Oct 2026
26 Sept 2026
3 Oct 2026
26 Sept 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. DSR 2023 SI. No. 2.6.1. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 93 | cum | 132 | ₹12,276 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 2023 SI. No. 4.1.8. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 31 | cum | 5,100 | ₹1,58,100 |
| 3 | 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from 5.1.3 natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023 SI. No- 5.1.3. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 16 | cum | 6,426 | ₹1,02,816 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023 SI. No. 5.2.2. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 20 | cum | 8,126 | ₹1,62,520 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) DSR 2023 SI. No- 6.1.1. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 18 | cum | 5,518 | ₹99,324 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand). DSR 2023 SI. No. 6.4.1. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 39 | cum | 6,996 | ₹2,72,844 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural ources). DSR 2023 SI. No. 5.3. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 47 | cum | 8,614 | ₹4,04,858 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars. DSR 2023 SI. No- 5.22.1. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 8,765 | kg | 80 | ₹7,01,200 |
| 9 | Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only. Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily. Double charge vitrified tile polished finish of size of Tile 600x600mm. All Material, Labour, T&P etc also including labour cess and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge. DSR 2023 SI. No- 11.41.2. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 127 | sqm | 1,163 | ₹1,47,701 |
| 10 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigme of matching shade complete. DSR 2023 SI.No 8.31. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 58 | sqm | 949 | ₹55,042 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Tendernotice_2.pdf
PDF • 1.19 MB
BOQ_2243301.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .