Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹29.2 L Per unit ₹79,001 · 37 Nos. | ₹29.2 L Per unit ₹79,001 · 37 Nos. |
| 2 | ₹49.8 L Per unit ₹79,001 · 63 Nos. 5 7 F TYPE 4TH MAIN ROAD SIDCO NAGAR VILLIVAKKAM CHENNAI TAMIL NADU 600049 | THIRUVALLUR | TAMIL NADU | 600049 | ₹49.8 L Per unit ₹79,001 · 63 Nos. |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
26 May 2026, 2:15 pmClosed
Single Packet
Normal Tender
No
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
Expenditure
General
P8
3 conditions · 2 needing a document upload
For Regular Order:- : "Previous Regular Suppliers of MU Couplers (i.e. OEMs or their authorised dealers) whose prototype / Type Test reports have been cleared by RDSO for RDSO modification sheet no. RDSO/PE/MS /AC/0080-2019 (Rev.2). Note: i)Purchaser reserves the right to procure entire or bulk quantity (minimum 80% of net procurable quantity) from Regular Suppliers. (ii) Dealers shall submit a valid tender specific authorisation certificate from OEM as per Annexure-II of Bid document (ii)Tenderer shall submit the supply credentials in the form of Purchase Orders copies along with inspection certificates/R-Notes. The responsibility to upload proof of supply rests solely and entirely with the tenderer. However purchaser reserves the right to utilize the record of supplies made to ICF, if readily available. (iii) Tenderer shall submit installation and commissioning certificate for supply and installation of MU couplers issued by ICF/RCF/MCF"
For Developmental Order:- : Previous Developmental Suppliers of MU Couplers (i.e. OEMs or their authorised dealers) whose prototype / Type Test reports have been cleared by RDSO for RDSO modification sheet no.RDSO/PE/MS/AC/0080-2019 (Rev.2). Note: (i) Dealers shall submit a valid tender specific authorisation certificate from OEMs as per annexure-II of Bid document (ii)Tenderer shall submit the supply credentials in the form of Purchase Orders copies along with inspection certificates/ R-Notes. The responsibility to upload proof of supply rests solely and entirely with the tenderer. However purchaser reserves the right to utilize the record of supplies made to ICF, if readily available. (iii) Tenderer shall submit installation and commissioning certificate for the supply and installation of MU couplers issued by ICF/RCF/MCF".
As per Public procurement (Preference to Make in India) order 2017, as amended, tendered item is to be procured from Class-I Local Suppliers only and the vendors who do not qualify to be Class-I Local Suppliers should not quote in the tender as their offers shall not be considered for any ordering.
52 conditions · 4 needing a document upload
In case of indigenous bidders, whether you are Large scale Industry or consortia of MSEs formed by NSIC, if yes, have you indicated quantum of sub contracts given to Micro and Small Enterprises (in percent of order value)?
Have you gone through the Eligibility Criteria and submitted all the documents mentioned therein?
Have you submitted the EMD or claimed exemption duly uploading documentary evidence in support of your claim along with Bid securing declaration as per clause 6.1 of section-I of Instructions to Tenderers of ICF Bid Document?
Have you confirmed for compliance of Public Procurement orders of Department of Expenditure regarding countries sharing land border with India?
Have you furnished the statement of Equipment & Quality Control?
Have you furnished tender specific letter of authority (if manufacturer has not quoted directly) to bid on behalf of manufacturer as per Annexure -lI of ICF bid document.
Have you kept your offer valid for the validity period as mentioned in NIT header?
Have you submitted the details of location(s) at which local value addition is made/ proposed?
Have you submitted self-declaration with respect to non- debarment under any provisions of DPIIT rules?
Have you submitted translated copy into English, for all documents in language other than English and all such documents should be signed by the authorised translator and notarized in India?
Have you submitted declaration for passing on the input tax credit as per para 2.8 and 2.9 of section-II of ICF Bid Document.
Have you submitted authenticated copy of the document authorizing the signatory to submit offer and commit on behalf of tenderers?
Public Procurement (Preference to Make in India) policy is applicable as per Clause 16 of Section-I of ICF Bid Document . The procurement shall be done in accordance with the extant instruction of DPIIT (Department of Promotion of Industry and Internal Trade) for Make in India policy.
EARNEST MONEY DEPOSIT (EMD): - : (i). Regarding EMD, please refer to clause 6.1 of section I Instructions to tenderer of ICF Bid Document attached to the tender. Tenderers seeking exemption from payment of EMD must upload the requisite documentary evidence in support of their claim for exemption from payment of EMD along with the offer. ii).Traders/Distributors/sole agent/works contract are not exempted for payment of EMD as they are excluded from the purview of the MSE policy. iii). In reference to condition No.6.1 (vi) of Section I of ICF Bid Document, the exemption of EMD is applicable only to the vendors having current and valid registration with PCMM of any Zonal Railways/Production Units for any of these trade Groups 3401 (Equipment, Spare parts and components required for Train Sets) & 4571 (Inter vehicular IV couplers parts and spares for coaches) Firm should submit valid registration certificate for proof.
(i) In case of MSE firm willing to claim the benefits under Public Procurement Policy (Preference to MSE) order 2012, the firm should upload with their offer, the proof of their being MSE registered with the agency mentioned in clause 13.1 of section-I of ICF Bid document, failing which such offers will not be liable for consideration of benefits detailed in para 13.3 of section-I of ICF Bid document. (ii) As per Gazette notification no. S.O.4926(E) dated 18.10.2022 amending notification no. S.O.2119(E) dated 26.06.2020 circulated vide Railway Board letter no. 2020/RS(G)/363/1 dated 03.11.2022 regarding re- classification of enterprises and Udyam registration, In case of an upward change in terms of plant and machinery or equipment or turnover or both, and consequent reclassification, an enterprise shall continue to avail of all non-tax benefits of the category it was in before the re-classification, for a period of three years from the date of such upward change.In such cases, the tenderer claiming such benefits shall submit necessary documentary evidence along with offer. (iii) Tenderers shall upload Udyam Registration detail showing that the enterprise is owned by Scheduled Castes (SC)/ Scheduled Tribes (ST)/ women entrepreneurs to claim the benefit under this subclassification.
The bidders s h o u l d quote the applicable HSN codes and it is the responsibility of t h e t e n d e r e r to quote the correct HSN code and upload the document.
Goods & Services Tax (GST): Will be applicable as per Clause 2.0 and all sub clauses of Section-II of ICF Bid Document.
Passing the benefits of ITC: I hereby confirm following: 'We hereby declare that in quoting the above price, we have taken into account the full effect of Input Tax Credit available under GST. We, further agree to pass on any financial gain/benefit as may become available in future in respect of all the input tax credit on the date of supply by way of reduction in price and advise the purchaser accordingly. We also undertake that we are aware of the provisions of section 171 of the CGST Act and consequences thereof if we fail to comply with the same."
It will be presumed that the firms who have submitted the e - bid have gone through and accepted all the terms and conditions of tender, until and unless firms specify the deviations from those conditions and so indicated specifically, under the headings - "Technical Deviation Statement" and "Commercial Deviation Statements". And if space available is not adequate, tenderers can upload a Statement of Deviations and a reference of uploaded deviation statement shall be given in "Technical or Commercial Deviation Statement". If there is any contradiction between any techno commercial terms and conditions quoted in e-offer and documents attached along with the e-offer,the terms & conditions quoted in e-offer will prevail over that of quoted in attached documents. Tenderers in their own interest are advised not to quote any techno commercial terms & conditions in attached documents.
Please submit the details of the location at which the local value addition is being made.
It is certified that the item offered meets the local content requirement for Class-I local supplier
The tenderers shall indicate the details of their jurisdictional Assessing Officers ( Designation,address & email id ) for GST
SVC: Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments in respect of the items stipulated in the contract (and not the raw materials thereof), within the original delivery period stipulated in the contract, or last unconditionally extended delivery period shall be to Railways' account. Only such variation shall be admissible which takes place after the tender opening date. No claim on a c c o u n t of statutory variation in respect of existing tax/ duty will be accepted unless the tenderer has clearly indicated in his offer the rate of tax/duty considered in his quoted rate. No claim on account of s t a t u t o r y v a r i a t i o n s h a l l be admissible on account of mis classification by the supplier/ contractor.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1 condition
Validity of Offer: No deviation from the offer validity period stipulated in the NIT header of this tender document is permitted. For additional conditions please refer Clause 12.0 of Section -I of ICF Bid Document.
1 location across Tamil Nadu · 100 Numbers total
DOUBLE END JUMPER 22 CORE 329-75-043 C-I & DOUBLE END JUMPER 22 CORE 329-75-043C-II spares for MU coupler for Amrit Bharat coaches
08261291
08261291
Open - Indigenous
Goods
Chennai, Tamil Nadu
₹0
₹1.6 L
30 Jul 2026
4 May 2026
2 items · 100 Numbers total
Supply of Double End Jumper of 22 core cable assembly for MU Coupler - Cross as per dr g no ICF/SK3-7-5-043(latest), Col- II for Amrit Bharat LSLRD/LWLRRM coaches. Note: (i) Tenderer shall submit prototype approval letter/First article Inspection (FAI) clearance letter issued by RDSO if appro ved. (ii) Prototype approval/ First article Inspection (FAI) clearance shall be obtained from RDSO if not approved. [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| FURNISHING DEPOT/ICF,Chennai, ICF | Tamil Nadu | 50.00 Numbers |
| Total | 50 Numbers | |
Supply of Double End Jumper of 22 core cable assembly for MU Coupler - Straight as per drg no ICF/SK3-7-5-043(latest), Col- I for Amrit Bharat LSLRD/LWLRRM coaches. Note: (i) Tenderer shal l submit prototype approval letter/First article Inspection (FAI) clearance letter issued by RDSO if appr oved. (ii) Prototype approval/ First article Inspection (FAI) clearance shall be obtained from RDSO if no t approved. [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| FURNISHING DEPOT/ICF,Chennai, ICF | Tamil Nadu | 50.00 Numbers |
| Total | 50 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5740273.pdf
ATTACHMENT
5740278.pdf
ATTACHMENT
5740275.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .