| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹46.3 LAccepted-Finance 2313 3 SECTOR 45 C CHANDIGARH | ₹46.3 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹47.1 LRejected-Finance 1192 SECTOR 79 MOHALI | ₹47.1 L | L-2 | Rejected-Finance Not L-1 |
Tender Value
₹47.4 L
EMD Value
₹94,673
Closing Date
4 May 2026, 3:00 pmClosed
Executive Engineer Hort. Divn No.1, M.C., Chd.
Executive Engineer Hort. Divn No.1, M.C., Chd.
Construction of 3 nos green belt public toilet blocks located in palm park, near house no. 2271 and near house no. 4760 four storey houses, village daddumajra, UT, Chandigarh, Landscaping.
2026_MCC_91975_1
MCC/H-1/74/2026
Open Tender
Civil Works
90 days
Construction of 3 nos green belt public toilet bl
Please refer tender
2 documents required · 2 mandatory
₹3,000
₹94,673
15 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil | 0.6 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Excavating trenches of required width for pipes, cables, etc. including excavation for sockets and dressing of sides, ramming of bottoms depth upto 1.5 including getting out the excavated soil, and then returning as required. In layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming watering, etc. and disposing of surplus excavated soil as directed with a lead of 50 m All kinds of soil etc. Pipes cables etc. exceeding 80 mm dia but not exceeding 300 mm dia | - | Mtr. | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | 1 | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinthlevel : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1 | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement-1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | - | Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | Cum | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand). | 1 | Cum. | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size). | - | Sqm. | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Applying a coat of residual petroleum bitumen of penetration 80/100 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | - | Sqm. | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.84 MB
BOQ_112536.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid