| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹83.2 LAdmitted-Finance | -21.51% | ₹83.2 L | L1 | Admitted-Finance |
| 2 | L2₹84.0 L+₹85,829.10 (1.03%)Admitted-Finance | -20.70% | ₹84.0 L+₹85,829.10 (1.03%) | L2 | Admitted-Finance |
| 3 | L3₹84.8 L+₹1.6 L (1.94%)Admitted-Finance | -19.99% | ₹84.8 L+₹1.6 L (1.94%) | L3 | Admitted-Finance |
| 4 | L4₹87.6 L+₹4.5 L (5.38%)Admitted-Finance | -17.29% | ₹87.6 L+₹4.5 L (5.38%) | L4 | Admitted-Finance |
| 5 | L5₹89.9 L+₹6.7 L (8.08%)Admitted-Finance | -15.17% | ₹89.9 L+₹6.7 L (8.08%) | L5 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
24 Aug 2026, 6:00 pmClosed
Executive Engineer Gangnahar OFD Dn 1st CAD SBNR
Executive Engineer Gangnahar OFD Dn 1st CAD SBNR
Construction of Pakka Water Course in Chak 1 SGM
2026_CECAD_588156_1
NIT03/26-27 Dn1st SBNR
Open Tender
Civil Works
Percentage
270 days
Chak 1 SGM
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EE Gangnahar OFD Dn 1st CAD/MD RISL
₹2.5 L
Yes
27 Aug 2026
15 Aug 2026
25 Aug 2026
15 Aug 2026
24 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF PUCCA WATER COURSE IN CHAK 1 SGM | |||||
| 1.01 | Earth work excavation in ordinary soil,undressed inclusive of all lift but with combined lead up to 200mtrs Ramming of earth work in layers by wooden iron rammers to obtain 90%of themaximumdry density ordinary soil | 15,951.06 | CUBIC METER | 85 | ₹13,55,840.1 |
| 1.02 | Dressing of Earth Work For all types of earth work new or repair work for all types of soil | 15,951.06 | CUBIC METER | 1.6 | ₹25,521.7 |
| 1.03 | Compaction of earthwork watering, ramming and dressing of sub grade including removal of irregularities upto 15 cm (6) depth | 5,467.15 | SQUARE METER | 9.5 | ₹51,937.92 |
| 1.04 | Brick masonry in foundation and plinth with brick designation 75 in cement sand mortar 1:5 Add extra over item no.6 For using bricks class designation 100 instead of class designation 75 | 1,016 | CUBIC METER | 5,389 | ₹54,75,224 |
| 1.05 | cement plaster with cement sand mortar (1:4) including racking of joints, smooth finishing and curing etc. Complete including all lead of all construction materials of thickness 10mm thick in one coat | 10,316.79 | SQUARE METER | 196 | ₹20,22,090.84 |
| 1.06 | Earth work excavation in Ordinary soil, undressed inclusive of all lift but with combined lead up to 200 mtrs | 3,717.96 | CUBIC METER | 75 | ₹2,78,847 |
| 1.07 | providing and laying cement concrete including curing, compaction etc. complete using stone aggregate 40mm nominal size in foundation plinth, excluding the cost of shutterimg using. CEMENT CONCRETE ( CAST IN SITU) 1 cement :4 sand:8 aggregate mix | 70.78 | CUBIC METER | 4,586 | ₹3,24,597.08 |
| 1.08 | Brick masonry in foundation and plinth with brick designation 75 in cement sand mortar 1:6 Add extra over item no.6 For using bricks class designation 100 instead of class designation 75 | 173.8 | CUBIC METER | 5,289 | ₹9,19,228.2 |
| 1.09 | 8 mm thick cement plaster in cement mortar (1:6) as per design and specification including cost of all materials including mechanical mixing of mortar with all lead and lift and stacking etc complete in all respect | 559.08 | SQUARE METER | 154.4 | ₹86,321.95 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.18 MB
BOQ_1044491.xls
BOQ • 0.29 MB
NIT03.pdf
Tender Documents • 5.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .