| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.1 L+₹7,382.52 (1.82%)Admitted-Fee/PreQual/Technical/Finance | ₹4.1 L+₹7,382.52 (1.82%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.5 L+₹39,309.40 (9.68%)Admitted-Fee/PreQual/Technical/Finance | ₹4.5 L+₹39,309.40 (9.68%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Srivarshan Builders L1 | PAT ENTERPRISES L2 | AK CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 3 | m3 | 4,571 ₹13,713 | 5,001 ₹15,003 | 650 ₹1,950 Lowest |
| 2.00 | 2. Desilting in the existing drain as per the direction of departmental officers etc. completed. | 20 | m3 | 108 ₹2,160 Lowest | 128 ₹2,560 | 350 ₹7,000 |
| 3.00 | 3. Dismantling the damaged Cement Concret work as per the instruction of Departmental officers. Including all initial lead and other labour charges | 3 | m3 | 502 ₹1,506 Lowest | 570 ₹1,710 | 650 ₹1,950 |
| 4.00 | 4. Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 34 | m3 | 200 ₹6,800 Lowest | 210 ₹7,140 | 400 ₹13,600 |
| 5.00 | 5. Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 7 | m3 | 5,860 ₹41,020 Lowest | 5,960 ₹41,720 | 6,500 ₹45,500 |
| 6.00 | 6. Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 128 | m2 | 510 ₹65,280 | 530 ₹67,840 | 430 ₹55,040 Lowest |
| 7.00 | 7. Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 20 | m3 | 6,700 ₹1,34,000 Lowest | 6,720 ₹1,34,400 | 7,300 ₹1,46,000 |
| 8.00 | 8. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 90 | m2 | 300 ₹27,000 Lowest | 308 ₹27,720 | 400 ₹36,000 |
| 9.00 | 9.Reinforced Cement Concrete in 1:1.5:3 Mix using 20 mm size hard broken granite Stone Jelly from approved quarry including Mixing, Laying, Compacting, Finishing, Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 3.1 | m3 | 8,396 ₹26,027.6 Lowest | 8,490 ₹26,319 | 8,650 ₹26,815 |
| 10.00 | 9.Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (MSand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard
specification | 3.4 | m3 | 7,200 ₹24,444 Lowest | 7,256 ₹24,634.12 | 8,200 ₹27,839 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
2 Jul 2026, 3:00 pmClosed
Assistant Commissioner, Central Zone,Coimbatore Co
The Assisstant Commissioner, Coimbatore City Municipal Corporation, Central Zone, Hosur road, Coimbatore 641 018.
Maintanence and Repair to the storm water drain and Providing CC Flooring at Sambath Street and Periyasamy Layout and Ward Areas in ward no 31 Central zone,Coimbatore Corporation
2026_MAWS_681469_1
e1/2026-CZ
Open Tender
Civil Works
Works
90 days
Central Zone, Coimbatore Corporation
As per the tender condition attached
5 documents required · 5 mandatory
₹0
₹5,000
4 Jul 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 3 | m3 | - | - |
| 2 | 2. Desilting in the existing drain as per the direction of departmental officers etc. completed. | 20 | m3 | - | - |
| 3 | 3. Dismantling the damaged Cement Concret work as per the instruction of Departmental officers. Including all initial lead and other labour charges | 3 | m3 | - | - |
| 4 | 4. Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 34 | m3 | - | - |
| 5 | 5. Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 7 | m3 | - | - |
| 6 | 6. Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 128 | m2 | - | - |
| 7 | 7. Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 20 | m3 | - | - |
| 8 | 8. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 90 | m2 | - | - |
| 9 | 9.Reinforced Cement Concrete in 1:1.5:3 Mix using 20 mm size hard broken granite Stone Jelly from approved quarry including Mixing, Laying, Compacting, Finishing, Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 3.1 | m3 | - | - |
| 10 | 9.Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (MSand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard
specification | 3.4 | m3 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TenderDocument.pdf
Tender Documents • 0.99 MB
ITB.pdf
Additional Documents • 0.20 MB
BOQ_818983.xls
BOQ • 0.32 MB
NIT.pdf
PDF • 0.35 MB
NIT.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .