Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC D NO 17 143 APOLLO GARDEN MADANADAR KUDIERUPPU NEAR KUMARAPURAM JN TIRUNELVELI 627 133 | TIRUNELVELI | TAMIL NADU | 627133 | ₹1.8 L | L1 | Accepted-AOC Tender Accepted |
| 2 | L2₹1.9 LRejected-AOC 30 OPP ALOK PRESS GHATI BADBHUNJA CHAMELI ROAD BHOPAL BHOPAL MADHYA PRADESH 462001 UDYAM MP 10 0044621 | BHOPAL | MADHYA PRADESH | 462001 | ₹1.9 L | L2 | Rejected-AOC Tender Not Accepted |
| Sl No | Description | Qty | Unit | APOLLO TRANSFORMERS AND FILTERS L1 | R K ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | Disconnection of HV power cable & its terminal box and earth flats | 1 | No | 1,820 ₹2,147.60 | 1,890 ₹2,230.20 |
| 2.00 | Disconnecton of LV power cable & terminal box/LV bus duct terminal connection & Terminal Box. | 1 | No | 3,950 ₹4,661 | 4,050 ₹4,779 |
| 3.00 | Releasing the old transformer oil from tank and Releasing the radiator cooling fins, valves and cleaning by using forced oil method. | 1 | No | 8,200 ₹9,676 | 8,250 ₹9,735 |
| 4.00 | Releasing the Buchholz relay, conservator tank,vent, pipe, oil & winding temperature gauges, Disconnection of winding CT terminals. | 1 | No | 7,150 ₹8,437 | 7,280 ₹8,590.40 |
| 5.00 | Charges for Leading and shifting of power transformer without oil from AHP-2 location to Unit 1 repair bay.(5Ton x 200 mtr =1000 Tons/mter) | 200 | Mtr | 20,600 ₹24,308 | 22,000 ₹25,960 |
| 6.00 | Removing the top cover of the Transformer and Disconnecting the HV/LV leads from Bushings and lifting the core and winding. | 1 | No | 5,480 ₹6,466.40 | 5,500 ₹6,490 |
| 7.00 | Complete cleaning of the Transformer tank,Core, Winding,Sludge removing and removing old gasket. | 1 | No | 3,400 ₹4,012 | 3,500 ₹4,130 |
| 8.00 | Complete cleaning oft the Tap switch and attending defects if any during testing. | 1 | No | 4,750 ₹5,605 | 4,800 ₹5,664 |
| 9.00 | Cleaning, servicing and gasket replacement to Buchholz relay,MOG,oil level gauge glass, explosion vent pipe, conservator tank,silicagel & replacement of diaphram. | 1 | No | 7,990 ₹9,428.20 | 8,100 ₹9,558 |
| 10.00 | Dismantling of HV & LV Bushings, cleaning,checking the bushing rods, replacing the deteriorated 'O' rings & gaskets by new, assembling and fixing in the transformer tank. | 1 | No | 9,990 ₹11,788.20 | 10,100 ₹11,918 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
6 Nov 2025, 2:00 pmClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES Circle EM II Charges for Oil Leak Arresting in HV LV bushing and Improve the BDV of Transformer oil in 2MVA power Transformer III at AHP Stage 2
2025_EB_616164_1
CE/SE/ES/TTPS/No.174/2025-26
Open Tender
Electrical and Maintenance Works
60 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹2,000
Yes
12 Feb 2026
22 Oct 2025
7 Nov 2025
22 Oct 2025
6 Nov 2025
22 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_736248.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid