| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | L1 | Accepted-AOC Accepted | |
| 2 | L2₹5.0 L+₹6,381.44 (1.30%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M RAMARAJ L1 | Creative construction L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 57 | Cum | 220 ₹12,540 Lowest | 300 ₹17,100 |
| 2.00 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 8 | Cum | 5,962 ₹47,696 Lowest | 5,962 ₹47,696 Lowest |
| 3.00Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the direction of the departmental officers etc complete | |||||
| 3.01 | Centering without strutting-for drain | 106 | Sqm | 534 ₹56,604 Lowest | 540 ₹57,240 |
| 3.02 | Centering for soffits of RC slab including strutting | 39 | Sqm | 712 ₹27,768 Lowest | 715 ₹27,885 |
| 4.00 | Plain cement concrete 1:3:6 mix (One cement three M.Sand and six aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc.,complete as per standard specification | 17 | Cum | 6,721 ₹1,14,257 Lowest | 6,721 ₹1,14,257 Lowest |
| 5.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor
steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications | 5 | Qtl | 9,542 ₹47,710 Lowest | 9,542 ₹47,710 Lowest |
| 6.00 | Reinforced Cement concrete 1:1.5:3 (one cement,one and half M.sand & three course aggregate) using 20mm gauge hand broken / and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 6 | Cum | 9,744 ₹58,464 Lowest | 9,744 ₹58,464 Lowest |
| 7.00 | Plastering in Cement Morter 1: 5 Mix using 12 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 28 | Sqm | 309 ₹8,652 Lowest | 310 ₹8,680 |
| 8.00 | Conveying the excavated earth from the site from 0 to 2 km lead including loading and unloading charges etc., completed. | 35 | Cum | 104 ₹3,640 Lowest | 105 ₹3,675 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
2 Sept 2026, 5:00 pmClosed
Assistant Commissioner
South Zone, Coimbatore Corporation, Kuniyamuthur, Coimbatore 641008
Construction of storm water drain and culvert at Arputham Nagar in Ward No 86, South Zone.
2026_MAWS_692579_10
e3/South zone/2026
Open Tender
Civil Works
Works
120 days
South Zone, Coimbatore Corporation, Kuniyamuthur
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
4 Oct 2026
10 Aug 2026
2 Sept 2026
10 Aug 2026
2 Sept 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 57 | Cum | - | - |
| 2 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 8 | Cum | - | - |
| 3Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the direction of the departmental officers etc complete | |||||
| 3.01 | Centering without strutting-for drain | 106 | Sqm | - | - |
| 3.02 | Centering for soffits of RC slab including strutting | 39 | Sqm | - | - |
| 4 | Plain cement concrete 1:3:6 mix (One cement three M.Sand and six aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc.,complete as per standard specification | 17 | Cum | - | - |
| 5 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor
steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications | 5 | Qtl | - | - |
| 6 | Reinforced Cement concrete 1:1.5:3 (one cement,one and half M.sand & three course aggregate) using 20mm gauge hand broken / and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 6 | Cum | - | - |
| 7 | Plastering in Cement Morter 1: 5 Mix using 12 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 28 | Sqm | - | - |
| 8 | Conveying the excavated earth from the site from 0 to 2 km lead including loading and unloading charges etc., completed. | 35 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
TenderDocument.pdf
Tender Documents • 0.23 MB
ITB.pdf
Additional Documents • 0.09 MB
BOQ_832868.xls
BOQ • 0.24 MB
E3EOTExtension2.pdf
PDF • 0.07 MB
E32026EOTExtension.pdf
PDF • 0.18 MB
E32026EOTExtension.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .