SE
EDC Hathras
Shiftting Of 11 KV Line In Deposite scheem
2022_DVVNL_752014_1
EDCH-117/2022-23
Open Tender
Electrical Works
Item Rate
80 days
Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL Website
₹3,000
6 Dec 2022
22 Nov 2022
29 Nov 2022
22 Nov 2022
29 Nov 2022
22 Nov 2022
Amount
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
9/11 Mtr. S.T. Poles
11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps Abc Bunch and other required line material, if any.
Dismentlling and removal of Pole Alloung With Dismentelling of All Fittings as per direction of supervising engineer. It includes the work of cartage, the cost of labour, T&P carrier etc. required for proper completion of work.
63 KVA T/F
9/11 Mtr. S.T. Poles
Double Pole
Dismentlling and removal of existing conductor from area, stacking and placement their coils in the respective J.Es (store) duly stacked, as per direction of supervising engineer. It includes the work of cartage, the cost of labour, T&P carrier etc. required for proper completion of work.
ACSR Weasel/Dog
Errection of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
STP (SP-33) 9.0/11 Mtr.
Double pole complet fitting
Construction of round pole plinth around the STP will be done Cement, sand and concrete in rasio 1:3:6 Rasio of size 450 mm dia and 600 mm hight (300 mm under the ground + 300mm over the ground). The plinth shoudbe plastered with 1/2 inch thick cement and sand of Rasio 1/4 and taper rounding the uper most part of the plinth the rate will include all cost of meterial labour and T&P ETC. for complition of work.
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
ACSR Weasal conductor
LT ABC Cable
Providing & Fixing of Following Clamps
11 KV X Arms Clamps for STP/PCC Pole
11 KV F Clamp for STP/PCC Pole
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Safe Cartage of Following T/F from old site to new pit site of work with Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection.
63 KVA T/F
Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The "T" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material.
Back Cartage of following material from pit site of work to je store/ stor center hathras as directed by the supervising engineer all cost of labour and T&P which require for completion of work distance range 0 to 50 km
STP Scrap
Iron Scrap
Conductor
R.N. ELECTRICAL WORKS
GOVIND ELECTRICAL
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .