| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC ELECTRICAL DIVISION HPSEBL MANDI | ₹1.1 L | L1 | Accepted-AOC Lowest rates |
| 2 | L2₹1.3 LRejected-Finance | ₹1.3 L | L2 | Rejected-Finance Higher rates |
| 3 | L3₹1.4 LRejected-Finance VPO JHAJRA TEHSIL NALAGARH DISTT SOLAN | SOLAN | HIMACHAL PRADESH | 171102 | ₹1.4 L | L3 | Rejected-Finance Higher rates |
Tender Value
₹1.6 L
EMD Value
₹1,581
Closing Date
24 Jan 2026, 3:00 pmClosed
Sr. executive Engineer
Electrical Division, HPSEBL, Arki.
Providing LT extension 3phase from existing 25KVA SStn., Badmal, and providing LT extension and augmentation from existing 25KVA SStn., Nagarward, in E section Bhumti under Electrical Sub-Division, HPSEBL, Bhumti.
2026_HPSEB_125641_1
HPSEBL/AED/NIT-40/2025-26
Open Tender
Electrical Works
60 days
Under ED Arki
Please refer Tender documents.
11 documents required · 11 mandatory
₹590
₹1,581
6 Feb 2026
15 Jan 2026
27 Jan 2026
15 Jan 2026
24 Jan 2026
15 Jan 2026
Material Part of LT Line. (Section Bhumti) (TS. No. 56/2025-26) (WBS No. 32100430-001-ARK-LT-014)
ACSR 6/1/3.35, 50mm2 (includes 2 conductor lengths for 1-phase and additional 1% ( sag, jumpering and wastage). (Provided by HPSEBL)
Steel Tubular poles 9 Mtr. Long. (Provided by HPSEBL)
Muffs with concrete filling.
Shackle Insulator (16KN).
D-Iron (U- Clamps).
Earth Knob
LT Stay Set.(i/c Stay Clamp) (Provided by HPSEBL)
Stay Wire (7/3.15mm). (6.0Kg Per Stay Set).
Earthing Set Complete.
Earth wire (GI 8SWG) ( additional 1% sag & wastage) @ 0.102kg/m. (Provided by HPSEBL)
Nuts and Bolts of various sizes (galvanised/ Coated preferably 16mm or more with flat and spring washers).
Aluminium Paint.
PVC Spacer
Material Part of LT Line. (Section Bhumti) (TS. No. 57/2025-26) (WBS No. 32100430-001-ARK-LT-015)
ACSR 6/1/3.35, 50mm2 (includes 2 conductor lengths for 1-phase and additional 1% ( sag, jumpering and wastage). (Provided by HPSEBL)
ACSR 6/1/2.59, 30mm2 (includes 2 conductor lengths for 1-phase and additional 1% ( sag, jumpering and wastage). (Provided by HPSEBL)
Steel Tubular poles 9 Mtr. Long. (Provided by HPSEBL)
Steel Tubular poles 8 Mtr. Long. (Provided by HPSEBL)
Muffs with concrete filling.
Shackle Insulator (16KN).
D-Iron (U- Clamps).
Earth Knob
LT Stay Set.(i/c Stay Clamp) (Provided by HPSEBL)
Stay Wire (7/3.15mm). (6.0Kg Per Stay Set).
Earthing Set Complete.
Earth wire (GI 8SWG) ( additional 1% sag & wastage) @ 0.102kg/m. (Provided by HPSEBL)
Nuts and Bolts of various sizes (galvanised/ Coated preferably 16mm or more with flat and spring washers).
Aluminium Paint.
PVC Spacer
Erection Part of LT Line. (Section Bhumti) (TS. No. 56/2025-26) (WBS No. 32100430-001-ARK-LT-014)
Erection of Steel Tubular Pole (8/9 Mtr long Single Pole Str.):- Digging of Pit, Drilling of holes in pole X-Arm, Erection of Pole, Erection of X-Arm, Shackle Insulator, Filling of Pit and ramming, Fixing of bracket, Painting of poles. (Complete in all respect according to REC construction standards)
Erection of Earthing:- Digging of Pit, Fixing of GI Wire to the earth System, Filling of Pit. (Complete in all respect according to REC construction standards.)
Erection of Stay Set LT:- Digging of Pit, Fixing of Stay Rod, Filling of Pit, Nozzeling & Tighting .(Complete in all respect according to REC construction standards.)
Sagging of Conductor:- ACSR / AAAC 50mm2, Laying of Conductor, Stringing & Sagging, Binding with Insulator . (Complete in all respect according to REC construction standards.) (Single conductor)
Laying stringing & sagging of GI wire. (Single conductor)
Mannual carriage of LT line material
Erection Part of LT Line. (Section Patta Browry) (TS. No. 121/2025-26) (WBS No. 32100430-001-ARK-LT-072)
Erection of Steel Tubular Pole (8/9 Mtr long Single Pole Str.):- Digging of Pit, Drilling of holes in pole X-Arm, Erection of Pole, Erection of X-Arm, Shackle Insulator, Filling of Pit and ramming, Fixing of bracket, Painting of poles. (Complete in all respect according to REC construction standards)
Erection of Earthing:- Digging of Pit, Fixing of GI Wire to the earth System, Filling of Pit. (Complete in all respect according to REC construction standards.)
Erection of Stay Set LT:- Digging of Pit, Fixing of Stay Rod, Filling of Pit, Nozzeling & Tighting .(Complete in all respect according to REC construction standards.)
Sagging of Conductor:- ACSR / AAAC 50mm2, Laying of Conductor, Stringing & Sagging, Binding with Insulator . (Complete in all respect according to REC construction standards.) (Single conductor)
Sagging of Conductor:- ACSR / AAAC 30mm2, Laying of Conductor, Stringing & Sagging, Binding with Insulator . (Complete in all respect according to REC construction standards.) (Single conductor)
Laying stringing & sagging of GI wire. (Single conductor)
Mannual carriage of LT line material
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
SBD40.pdf
Tender Documents • 2.61 MB
BOQ_185169.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid