Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.5 L
Closing Date
4 Nov 2021, 6:00 pmClosed
Executive Engineer
I D Anantnag
Restoration of Breaches at spots / Strengthening of weak embankments on Bud Khul Thajiwara ,ADS, and allied Networks
2021_IFC_144317_2
ENITNo11
Open Tender
Civil Works
Item Rate
15 days
Anantnag
as per NIT
2 documents required · 2 mandatory
₹1
Yes
Executive Engineer
Yes
29 Nov 2021
20 Oct 2021
5 Nov 2021
20 Oct 2021
4 Nov 2021
20 Oct 2021
Amount
Earthwork
Earth work in excavation by mechanical means over areas (Exceeding 30cm in depth, 1.5 Mtr in width as well as 10 Sqm on plan) including disposal of excavated earth, lead upto 25m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed. All kinds of soil
Dumping stone in Horizontal on level including cost of stone.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Hand-packing stones in wire-crates; including cost of stones and excluding cost of crates
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand
Supply of Empty Cement bags
supply and fixing of 4mm dia B.A wire woven crates (4"x4" mesh) as per ISI specification with lid /binding wire.including all carriages ( manual /Mechanical) up to site of work complete Job
Carriage of materials from source to Road site of work by M.T. and By H.L
Aggregates from source to site of work average 12 kms by MT and H/l 100 mts.
Sand from source to site of work average 15 Kms by MT and H/l 100 mts.
Cement from Divisional store to site of work average 05 Kms by MT and H/l 100mts.
Stones av lead avg 8 kms by M.T and 100 mtrs by H.L
MUSHTAQ AHMAD WANI
BASHIR AHMAD BHAT
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .