Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹99,975.80Admitted-Fee/PreQual/Technical/Finance | -31.30% | ₹99,975.80 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.1 L+₹6,257.58 (6.26%)Admitted-Fee/PreQual/Technical/Finance | -27.00% | ₹1.1 L+₹6,257.58 (6.26%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.1 L+₹13,388.32 (13.4%)Admitted-Fee/PreQual/Technical/Finance | -22.10% | ₹1.1 L+₹13,388.32 (13.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.4 L+₹44,821.76 (44.8%)Admitted-Fee/PreQual/Technical/Finance | -0.50% | ₹1.4 L+₹44,821.76 (44.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.5 L+₹45,447.52 (45.5%)Admitted-Fee/PreQual/Technical/Finance | -0.07% | ₹1.5 L+₹45,447.52 (45.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
Closing Date
13 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW SPN
EXECUTIVE ENGINEER REW SPN
C/O FOOT CULVERT NEAR H/O SHOWKAT DAR AT DANGERPORA KELLER
2026_RDPR_319396_13
Enit 068 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Shopian
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Rural Development and Panchayati Raj
Exempted
14 Sept 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Engagement of labours for site clearance and dewatering of trenches etc. | |||||
| 0.0 | Earthwork in excavation by manual means in trenches for foundations. | - | Cum | - | - |
| 3Supply and Placing of Stone Soling hand packed tightly in bed including levelling & ramming and carriage. | |||||
| 0.0 | Providing and laying in position of cement concrete of specified grade 1:4:8(M7.5) of N/S stone aggregate 40 mm size including all carriages upto site of work but excluding centering and shuttering etc. | - | Cum | - | - |
| 5 | P/L in position PCC of specified grade excluding the cost of centring and shuttering 1: 3: 6 .(CRUSHED) I/C ALL CARRIAGES | 1 | Cum | - | - |
| 0.0 | Providing and laying in position of RCC cement concrete of specified grade 1:1.5:3 (M20) of N/S stone aggregate 20 mm size including all carriages upto site of work but excluding centering and shuttering etc. | - | Cum | - | - |
| 7CENTERING AND SHUTTERING FOR SUSPENDED FLOORS ,I/C AND REMOVAL OF SAME. SLAB, CAP , EDGES OF SLAB | |||||
| 0.0 | CENTRING & SHUTTERING, I/C REMOVAL ALSO.
ABUTTS. | 1 | sqm | - | - |
| 9Steel reinforcement for RCC work including cutting, bending, placing in position and all carriages up to site of work. | |||||
| 0.0 | Structural steel work in builtup sections,trusses and framed work incl. cutting,hoisting,fixing in position and applying a priming coat of approved steel primer and synthetic enamel paint of approved brand,all complete. | - | kg | 1 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_1057956.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .