| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 CrSame as L1Admitted-Finance | ₹1.2 CrSame as L1 | L2 | Admitted-Finance |
| 3 | L2₹1.2 CrSame as L1Admitted-Finance | ₹1.2 CrSame as L1 | L2 | Admitted-Finance |
| 4 | L2₹1.2 CrSame as L1Admitted-Finance | ₹1.2 CrSame as L1 | L2 | Admitted-Finance |
| 5 | L2₹1.2 CrSame as L1Admitted-Finance | ₹1.2 CrSame as L1 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Smti Sewali Bordoloi Phukan L2 | SRI PURNAKANTA HAZARIKA L2 | Mustafa Hussain L2 | DEEPAK BORA L1 | Biju Duarah L2 | Abul Fazal Abdullah L3 | Sri Jiban Chutia L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department | 19 | metre | 5,000 ₹95,000 | 1,500 ₹28,500 | 1,250 ₹23,750 | 1,212.11 ₹23,030.13 Lowest | 1,350 ₹25,650 | 1,275 ₹24,225 | 1,500 ₹28,500 |
| 2.00 | Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. | 25 | metre | 7,500 ₹1,87,500 | 7,000 ₹1,75,000 | 7,500 ₹1,87,500 | 12,284.66 ₹3,07,116.53 | 10,000 ₹2,50,000 | 12,920 ₹3,23,000 | 1,200 ₹30,000 Lowest |
| 3.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,backfilling the excavated earth to the extent required and utilising theremaining earth locally for road work.)
(i) Ordinary soil
A Manual Means (Depth upto 3 m) ( Without dewatering ) | 106.5 | cum | 100 ₹10,650 Lowest | 450 ₹47,925 | 410 ₹43,665 | 115.43 ₹12,293.24 | 115 ₹12,247.5 | 121 ₹12,886.5 | 110 ₹11,715 |
| 4.00 | Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000 mm).
Without Plasticiser | 204 | metre | 12,200 ₹24,88,800 | 10,000 ₹20,40,000 | 8,500 ₹17,34,000 Lowest | 10,391.72 ₹21,19,910.78 | 12,000 ₹24,48,000 | 9,000 ₹18,36,000 | 9,800 ₹19,99,200 |
| 5.00 | Pile load test on single vertical pile in accordance with IS:2911(Part-IV).
a) Initial and Routine load test | 210 | ton | 150 ₹31,500 Lowest | 370 ₹77,700 | 250 ₹52,500 | 337.1 ₹70,789.95 | 250 ₹52,500 | 300 ₹63,000 | 155 ₹32,550 |
| 6.00 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification.
RCC Grade M25
Using Concrete Mixer | 94.17 | cum | 7,500 ₹7,06,275 | 8,300 ₹7,81,611 | 8,100 ₹7,62,777 | 6,752.11 ₹6,35,846.67 | 6,500 ₹6,12,105 Lowest | 7,115 ₹6,70,019.55 | 8,000 ₹7,53,360 |
| 7.00 | Levelling course for Pile cap (ref of MoRTH 1100 & 1700) | 6.63 | cum | 5,000 ₹33,155 Lowest | 6,500 ₹43,101.5 | 6,600 ₹43,764.6 | 5,262.77 ₹34,897.41 | 5,500 ₹36,470.5 | 5,543 ₹36,755.63 | 7,500 ₹49,732.5 |
| 8.00 | Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications
(a) TMT-IS 1786 ( Fe-500 D) Primary Producer tonne 78391.00 (TATA/ SAIL/ Esser Steel/ Jindal Panther steel/ Shyam steel or equivalent | 22.96 | tonne | 95,000 ₹21,81,675 | 86,700 ₹19,91,065.5 | 91,000 ₹20,89,815 | 57,964 ₹13,31,143.17 Lowest | 75,000 ₹17,22,375 | 75,000 ₹17,22,375 | 90,000 ₹20,66,850 |
| 9.00 | Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork
I Without plasticiser.
PCC Grade M25
a Height upto 5m
Case I Using concrete Mixer | 62.01 | cum | 9,000 ₹5,58,081 | 8,700 ₹5,39,478.3 | 8,500 ₹5,27,076.5 | 7,225.07 ₹4,48,019.33 Lowest | 7,300 ₹4,52,665.7 | 7,600 ₹4,71,268.4 | 15,000 ₹9,30,135 |
| 10.00 | Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications
(a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal Panther steel/ Shyam steel or equivalent | 6.82 | tonne | 75,000 ₹5,11,125 | 87,000 ₹5,92,905 | 92,000 ₹6,26,980 | 57,585.73 ₹3,92,446.78 Lowest | 75,000 ₹5,11,125 | 75,000 ₹5,11,125 | 95,000 ₹6,47,425 |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
22 Oct 2021, 2:00 pmClosed
CE., PWD (Roads), Assam, Chandmari, Ghy-3
O/O The CE., PWD (Roads), Assam, Chandmari, Ghy-3
RIDF-XXVII/Jorhat/01 Construction of RCC Br. No. 1/1 on Jonaki Mandal Road over Charaipani River with approaches and protection work under RIDF-XXVII (NABARD) for the year 2021-22 under PWD, Jorhat Dergaon and Titabor Territorial Road Division
2021_PWD_23097_1
CE/STBR/ RIDF-XXVII/03/21-22/5 Dtd. 14 -09-2021
Open Tender
Civil Works – Roads
Item Rate
545 days
Titabor
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,200
Empowered officer, Assam State Road Board
₹2.8 L
Yes
21 Jan 2022
1 Oct 2021
25 Oct 2021
1 Oct 2021
22 Oct 2021
1 Oct 2021
1 Oct 2021 - 22 Oct 2021
Amount
Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,backfilling the excavated earth to the extent required and utilising theremaining earth locally for road work.) (i) Ordinary soil A Manual Means (Depth upto 3 m) ( Without dewatering )
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000 mm). Without Plasticiser
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a) Initial and Routine load test
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M25 Using Concrete Mixer
Levelling course for Pile cap (ref of MoRTH 1100 & 1700)
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer tonne 78391.00 (TATA/ SAIL/ Esser Steel/ Jindal Panther steel/ Shyam steel or equivalent
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork I Without plasticiser. PCC Grade M25 a Height upto 5m Case I Using concrete Mixer
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal Panther steel/ Shyam steel or equivalent
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming centimetre to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete includingall accessories as per drawing and Technical Specifications.
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8. Sandy material
Furnishing and Placing Reinforced/ Prestressed cement concrete in super- structure as per drawing and Technical Specification’ including steel shuttering formwork. I Without Plasticiser RCC Grade M30 Case 1 Using concrete mixer For T-beam & slab a Height upto 5m
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal Panther steel/ Shyam steel or equivalent)
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Drainage Spouts complete as per drawing and Technical specification
Burried Joint (Providing and laying a burried expansion joint, expansion gap being 20 mm, covered with 12 mm thick, 200 mm wide galvanised wieldable structural steel plate as per IS: 2062, placed symmetrical to centre line of the joint, resting freely over the top surfaces of the deck concrete, welding of 8mm dia, 100mm long galvanized nails spaced 300mm C/C along the center line of the plate , all as specified in clause 2604.)
Carrying out Sub Soil investigation (SSI) for all type of soil (except boring in rock) upto depthof 30 m or refusal (N=100) for each foundation location as per IRC 78-2014 and submission of SSI report to the Engineer in charge for approval . Preparation & submission of Design calculation & Drawings of foundation , sub structure,Super structure as relevant IRC Codes and SSI Report , 2( two) each of Design& Drawing of each bridge to be submitted for approval and 8 ( eight)copies after approval of competent authority. including providing and erecting informatory sign board as per norms of NABARD
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 (Including cost of testing of materials at site and laboratory as directed by the deptt.)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical Specification Clause 303.1. (i) Private Land
Granular Sub-base with Close Graded Material (Table:- 400-1) By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density,complete as per cl. 401 With all leads and lift upto the worksite ( Including cost of testing of materials at site and laboratory as directed by the deptt.) (i) for grading- II Material
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density (With all leads and lift upto the worksite). A) By Manual Means: a) 'Grading- III i) Using Screening Type-B (11.2mm Agg.)
Providing and laying Interlocking Concrete Block Pavement (ICBP) conforming to IS:15658-2006 including all lead and lift complete as per technical specification and as directed. A) 80mm thick interlocking precast blocks having compressive strength of 40N/sq.mm.(With all leads and lift upto the worksite).
RCC Guard Post: Supplying, fitting and fixing RCC guard post 150cm long erected 75cm above the ground and 75cm below the ground with M-15 grade (nominal mix 1:2:4 with broken stone aggregate up to 20mm size) of cement concrete and required reinforcement tied in position with annealed black wire including centering, moulding the top, curing including painting concrete surfaces in 23cm strips upto 0.75m from the top alternately in black and white and having 2 nos. reflective band of desired shade etc. complete as per design and as directed. 30 cm dia. RCC guard post with reinforcement of 6nos. 12mm dia TMT main steel bars and 6mm TMT/ MS stirrups at 15cm c/c.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means (I) Without dewatering upto 3 m depth
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Stone/Boulder
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
Smti Sewali Bordoloi Phukan
Mustafa Hussain
Biju Duarah
SRI PURNAKANTA HAZARIKA
Sri Jiban Chutia
Abul Fazal Abdullah
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
Tendernotice_2.pdf
PDF • 0.63 MB
Tendernotice_3.pdf
PDF • 0.04 MB
BOQ_35514.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .