| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹23.7 L+₹4.1 L (21.1%)Accepted-Finance | L2 | Accepted-Finance Accepted |
Tender Value
₹29.0 L
EMD Value
₹58,030
Closing Date
15 Mar 2023, 3:00 pmClosed
EE/RCD/APWD/WG
EE/RCD/APWD/WG
AR and MO water supply under AE, Ferrargunj RCD, APWD, Wimberly Gunj during 2022-23. SW Construction of Apron Curtain walls i/c wire mesh fencing as a protection works for existing check weir at Chakku Pahad Nallah.
2023_APWD_9468_1
NIT No.135/EE/RCD/APWD/WG/2022-23
Open Tender
Civil Works - Others
Item Rate
90 days
EE/RCD/APWD/WG
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹58,030
17 Mar 2023
22 Feb 2023
17 Mar 2023
22 Feb 2023
15 Mar 2023
5 Mar 2023
Amount
EARTH WORK
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
REINFORCED CEMENT CONCRETE
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu- ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
STEEL WORK
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer.
G.I. pipes
ROAD WORK
Dry stone pitching 22.5 cm thick including supply of stones andpreparing surface complete.
Providing and fixing G.I. chain link fabric fencing of required width inmesh size 50x50 mm including strengthening with 2 mm dia wire ornuts, bolts and washers as required complete as per the direction ofEngineer-in-charge.
Made of G.I. wire of dia. 4 mm, PVC coated to achieveouter dia not less than 5 mm in required colour and shade
FINISHING
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade :
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work
Abdul Gafoor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .