| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-Finance | L1 | Accepted-Finance LOWER RATE FOUND | |
| 2 | L2₹9.3 L+₹928.58 (0.10%)Rejected-Finance | L2 | Rejected-Finance HIGHER RATE FOUND | |
| 3 | L3₹9.5 L+₹19,685.79 (2.12%)Rejected-Finance BIRSINGHPUR SULTANPUR 228141 | SULTANPUR | UTTAR PRADESH | 228141 | L3 | Rejected-Finance HIGHER RATE FOUND |
Tender Value
Refer Docs
EMD Value
₹18,571
Closing Date
18 Sept 2026, 12:00 pmClosed
EO NPP SULTANPUR
EO NPP SULTANPUR
1-Ward Paltan Bazar Mein Farid ke Makan Se Mohammed Ali Abida Bano Akhtar Raees Ahmad ke Makan Hote Hue Samima Bano ke Makan Tak covered Nali Va CC Sadak Nirman
2026_DOLBU_1182541_1
553/NPPSUL/2026-27 DT. 25.08.2026
Open Tender
Civil Works
Percentage
90 days
NPP SULTANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,095
EO NPP SULTANPURE
₹18,571
6 Oct 2026
5 Sept 2026
18 Sept 2026
5 Sept 2026
18 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismanting of brick work work or stone work in lime or cement and including stacking of material as directed by the Engineer-In-charge with in a distance of 60 metres | 5.39 | Cum | 442 | ₹2,382.38 |
| 2 | Dismantiing old interfocking rond as per SOR CH-17 ltem no.13 | 397.3 | Sqm | 8.9 | ₹3,535.97 |
| 3 | EA excavation in foundation in ordinary soil .. Etc complete.ns nor tor 2.1 | 36.75 | Cum | 125 | ₹4,593.75 |
| 4 | Disposal of malwa upto 5 km distance | 37.17 | Cum | 183.5 | ₹6,820.7 |
| 5 | PCC wch 1:6:12 cement tsand & 40mm brick bat. V/c laboure material T&P .. etc complete.as per SOR CH-5 item no.273 | 10.5 | Cum | 4,500 | ₹47,250 |
| 6 | Construction of granular sub-base by providing coarse graded Material, grading one spreading in untform layers with motor grader on prepared surface, mbing by mix in place mothod with rotavator at OMC and compacting with vibratory power roller to achieve the desirod density. complete as per clause 401 | 29.8 | Cum | 3,361 | ₹1,00,157.8 |
| 7 | M150 Brick work wisth 1:4 cement and c.sand mortor ... etcas per SOR CH-6 item no.6.1.1 | 25.59 | Cum | 6,267 | ₹1,60,372.53 |
| 8 | Avg 12mm thk plaster with 1:4 cement and c.sand mortor i/c all as per SOR ch.11 item no.13.4.1 | 135 | Sqm | 191 | ₹25,785 |
| 9 | Providing and laying Reinforced cement concrete 1:1.5:31 coment:1.5 cource sand:3 graded stone aggregate 20 mm nominal size as per sor 5.1.2 | 7.5 | Cum | 8,120 | ₹60,900 |
| 10 | Supply and binding of reinforcement steel in RCC work etc all compt. | 5.89 | Qtl | 7,853 | ₹46,254.17 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_2223553.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .