Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 LAccepted-AOC 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.3 L+₹412.38 (0.02%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹21.6 L+₹25,256.32 (1.19%)Rejected-Finance TUNDLA FIROZABAD | FIROZABAD | FIROZABAD | UTTAR PRADESH | L3 | Rejected-Finance L3 | |
| 4 | L4₹22.1 L+₹77,797 (3.65%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹22.3 L+₹96,255.80 (4.52%)Rejected-Finance 0 WARD NO 9 PIPERTAR KATHAN KHAMARIA POLICE CHOWKI SANT RAVIDAS NAGAR UTTAR PRADESH 221306 | BHADOHI | UTTAR PRADESH | 221306 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S Harish Kumar Contractor L1 | SHRI BALAJI CONSTRUCTION L5 | M/S PRADEEP ASSOCIATES L12 | Rakesh kumar L9 | SHREE RAMESHWAR SINGH L11 | M/s AMAN MACHINERY STORE L4 | SIYA INFRATECH L6 | Om Builders L13 | M/S YOGESH ENTERPRISES L10 | M/s GURUKRAPA CONSTRUCTION L3 | M/s VINAY KUMAR CONTRACTOR L14 | Jitendra Construction L15 | S F INFRA PROJECTS L8 | TOTA RAM SHARMA L2 | M/S A V R BUILDERS L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | UPROOTTING JHUNDS AND MOONJ DISPOSAL AWAY FROM SITE | 6,900 | SQM | 23.29 ₹1,60,701 | 24.63 ₹1,69,947 | 20 ₹1,38,000 | 2 ₹13,800 Lowest | 3 ₹20,700 | 15 ₹1,03,500 | 10 ₹69,000 | 30 ₹2,07,000 | 27.55 ₹1,90,095 | 12.92 ₹89,148 | 30 ₹2,07,000 | 20 ₹1,38,000 | 5 ₹34,500 | 5 ₹34,500 | 3.5 ₹24,150 |
| 2.00 | CLEANING THIKS BUSHES AND THORNY JUNGLE WITHOUT UPROOTING | 13,800 | SQM | 2.93 ₹40,434 | 3.09 ₹42,642 | 3 ₹41,400 | 2 ₹27,600 | 3 ₹41,400 | 2.75 ₹37,950 | 2 ₹27,600 | 4.4 ₹60,720 | 3.46 ₹47,748 | 3.06 ₹42,228 | 4 ₹55,200 | 5 ₹69,000 | 1 ₹13,800 Lowest | 2 ₹27,600 | 3.5 ₹48,300 |
| 3.00 | EARTH WORK IN FOUNDATION IN DRY SOIL INCLUDING LEFT UP TO 1.50 AND LEAD UP TO 30M INCLUDING BACK FILLING WATERING AND RAMMING OF EXCVATED EARTH IN TO THE STRUCTURE AND THE SIDES OF FOUNDATION TRENCHES OR INTO THE PLINGTH WITH REMOVAL AND DISPOSAL OF SURPLUS EARTH AS DIRECTED BY ENGINEER IN CHARGE UP TO 30 M LEAD FROM THE FOUNDATION | 61.66 | CUM | 66.55 ₹4,103.47 | 70.39 ₹4,340.25 | 80 ₹4,932.8 | 80 ₹4,932.8 | 40 ₹2,466.4 Lowest | 69 ₹4,254.54 | 100 ₹6,166 | 88 ₹5,426.08 | 78.74 ₹4,855.11 | 67.98 ₹4,191.65 | 100 ₹6,166 | 90 ₹5,549.4 | 40 ₹2,466.4 Lowest | 50 ₹3,083 | 50 ₹3,083 |
| 4.00 | RCC PRECAST BOUNDARY COMPOUND WALL SUB PRESTRESSED PRECAST BOUNDARY WALL INDTALLATION M 25 GRADE CONCRETE COMPOND WALL PILLAR SIZE 150MM X 150MM WITH 7 NOS 3MM HTC WIRE AND M 25 GRADE CONCRETE PANEL SIZE 300mm X 45mm X 2100 mm WITH 4 Nos 3mm HTC WIR AND 2 SIDE SAME FINISHING M 25 GRADE CONCRETE INCLUDING ALL MATERIALS LABOUR TRANPORTATION ETC | 1,984.32 | SQM | 765.33 ₹15,18,659.63 Lowest | 809.48 ₹16,06,267.35 | 1,000 ₹19,84,320 | 950 ₹18,85,104 | 980 ₹19,44,633.6 | 863 ₹17,12,468.16 | 850 ₹16,86,672 | 1,000 ₹19,84,320 | 905.51 ₹17,96,821.6 | 816 ₹16,19,205.12 | 1,080 ₹21,43,065.6 | 1,035 ₹20,53,771.2 | 1,000 ₹19,84,320 | 875 ₹17,36,280 | 900 ₹17,85,888 |
| 5.00 | FINISHING WALLS TWO COATS WITH WATER PROOFING CEMENT PAINT OF APPROVED MAKE SUCH AS SUPER SNOWCEM DUROCEM ROBIANCE GUTTUCEM SUPERCEM QUALITYAND OF REQUIRED SHADE ON UNDERCORATED WALL SURFACE OVER AND INCLUDING ONE COAT WHITE CEMENT PRIMER TO GIVE AND EVEN SHADE AFTER THOUGHLYBRUSHING THE SURFACE INCLUDING COST OF MATERIAL LABOUR T AND P ETC COMPLETION OF THE WORK | 3,968.64 | SQM | 47.92 ₹1,90,177.23 | 44 ₹1,74,620.16 | 55 ₹2,18,275.2 | 90 ₹3,57,177.6 | 97.25 ₹3,85,950.24 | 38 ₹1,50,808.32 Lowest | 57 ₹2,26,212.48 | 60 ₹2,38,118.4 | 56.69 ₹2,24,982.2 | 81.58 ₹3,23,761.65 | 40 ₹1,58,745.6 | 52 ₹2,06,369.28 | 60 ₹2,38,118.4 | 55 ₹2,18,275.2 | 105 ₹4,16,707.2 |
| 6.00 | EARTH WORK IN FOUNDATION IN DRY SOIL INCLUDING LEFT UP TO 1.50 AND LEAD UP TO 30M INCLUDING BACK FILLING WATERING AND RAMMING OF EXCVATED EARTH IN TO THE STRUCTURE AND THE SIDES OF FOUNDATION TRENCHES OR INTO THE PLINGTH WITH REMOVAL AND DISPOSAL OF SURP | 2 | NO | 62,868.12 ₹1,25,736.24 | 66,496 ₹1,32,992 | 75,000 ₹1,50,000 | 90 ₹180 | 40 ₹80 Lowest | 52,000 ₹1,04,000 | 95,000 ₹1,90,000 | 83,000 ₹1,66,000 | 74,383.71 ₹1,48,767.42 | 67.98 ₹135.96 | 90,000 ₹1,80,000 | 90 ₹180 | 60 ₹120 | 4,000 ₹8,000 | 50 ₹100 |
| 7.00 | PRIVIDING AND LAYING RCC 1 1.5 3 INCLUDING PLACING WITH ALL LABOUR T AND P ETC COMPLETE | 4.95 | CUM | 5,053.07 ₹25,012.7 | 5,344.1 ₹26,453.3 | 6,500 ₹32,175 | 7,000 ₹34,650 | 6,000 ₹29,700 | 5,300 ₹26,235 | 5,000 ₹24,750 | 6,700 ₹33,165 | 5,978.64 ₹29,594.27 | 4,758 ₹23,552.1 | 5,800 ₹28,710 | 5,500 ₹27,225 | 7,000 ₹34,650 | 5,700 ₹28,215 | 4,400 ₹21,780 Lowest |
| 8.00 | CENTERING AND SHUTTERING FOR RCC WORK | 44.22 | SQM | 535.73 ₹23,689.98 | 566.7 ₹25,059.47 | 500 ₹22,110 | 350 ₹15,477 | 840 ₹37,144.8 | 563 ₹24,895.86 | 500 ₹22,110 | 710 ₹31,396.2 | 633.85 ₹28,028.85 | 203 ₹8,976.66 Lowest | 400 ₹17,688 | 7,000 ₹3,09,540 | 500 ₹22,110 | 400 ₹17,688 | 600 ₹26,532 |
| 9.00 | PROVIDING AND FIXING STEEL REINFORCEMENT FOR RCC WORK INCLUDING ALL COST OF MATERIAL BINDING BENDING AND PLACING IN POSITION AND T AND P AND LABOUR ETC | 0.78 | MT | 54,403.29 ₹42,434.57 Lowest | 57,542.42 ₹44,883.09 | 65,000 ₹50,700 | 70,000 ₹54,600 | 76,000 ₹59,280 | 57,223 ₹44,633.94 | 80,000 ₹62,400 | 71,000 ₹55,380 | 64,368.38 ₹50,207.34 | 57,700 ₹45,006 | 80,000 ₹62,400 | 82,000 ₹63,960 | 65,000 ₹50,700 | 74,000 ₹57,720 | 65,000 ₹50,700 |
Tender Value
₹32.0 L
EMD Value
₹64,040
Closing Date
10 Sept 2025, 2:00 pmClosed
EE ADGC ALIGARH
EE ADGC ALIGARH
CONSTRUCTION OF BOUNDRY WALL FOR THE SECURITY OF SIKANDRARAO INPECTION HOUSE SITUATED ON SIKANDRARO DY
2025_UPIDC_1070366_14
3542 dt 23.08.2025
Open Tender
Civil Works
Item Rate
90 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹64,040
19 Nov 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .