| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.4 LAdmitted-Fee/PreQual/Technical/Finance | -25.00% | ₹25.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹33.9 L+₹8.4 L (33.2%)Admitted-Fee/PreQual/Technical/Finance AT P O P S LATHOR BLOCK KHAPRAKHOL DIST BALANGIR PIN 767038 | LATHOR | BALANGIR | ODISHA | 767038 | -0.10% | ₹33.9 L+₹8.4 L (33.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹33.9 L+₹8.4 L (33.2%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹33.9 L+₹8.4 L (33.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹33.9 L+₹8.4 L (33.2%)Admitted-Fee/PreQual/Technical/Finance AT LATHOR PO LATHOR PS HARISHANKAR ROAD DIST BALANGIR PIN 767038 | BALANGIR | ODISHA | 767038 | -0.10% | ₹33.9 L+₹8.4 L (33.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹33.9 L+₹8.4 L (33.2%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹33.9 L+₹8.4 L (33.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹33.9 L
EMD Value
₹33,900
Closing Date
23 Jul 2026, 5:00 pmClosed
Executive Engineer, R.W.Division,Patnagarh
O/o the Superintending Engineer, R.W.D, Patnagarh
Periodical Maintenance to PWD road to Parlimal for the year 2026-27
2026_CERWI_134727_1
EEPTNG-online-02/2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
Patnagarh
2 documents required · 2 mandatory
₹6,000
₹33,900
Yes
5 Sept 2026
9 Jul 2026
24 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
9 Jul 2026 - 22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning the existing Black topped surface with removal of foreign materials with brooms or soft btrushes and finally dusting with old gunny bages and/or compressed air to receive bituminous etc complete as per direction of EIC. | 7,950 | sqm | 5.59 | ₹44,440.5 |
| 2 | Providing, laying, spreading and compacting stone aggregate specific size to WBM-III specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber the voids with small stones and hand packing the same to proper camber, applying and brooming requsite type of screening / binding materials filling up interstices of coarse agreegate, watering and compacting to the required density as per clause 404 of MoSRT&H specification for road and bridge work etc all complete including cost, conveyance, royalty and taxes of all materials with all labour and T & P etc complete. | 29.81 | cum | 3,265.17 | ₹97,334.72 |
| 3 | Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder of 60/70 penetration grade of bitumen laid onprepared surface and rolling with 8-10 tonne smooth wheeled steel roller as per Clause 510 of MoSRT&H Specifications
for Road & Bridge works (4th Revision) | 397.5 | sqm | 119.24 | ₹47,397.9 |
| 4 | Providing & applying tack coat with Bitumen emulsion using emulsion pressere distributer @0.20kg / sqm on the prepared bituminous / granular suerface cleaned with mechanical broom as per clause 503 of MoSRT & H specification for road & bridge works. | 7,950 | sqm | 18.69 | ₹1,48,585.5 |
| 5 | Providing , laying semi dence bituminious concrete with batch type hot mix plant using crushed aggregates of specified grading, primixed with bituminous binder of 60/70 penitration grade of bitumen, transporting the hot mix to work site, laying with hydrostaic paver finisher with sensor control to the required grade, level on the alignment, rolling with smooth wheeled, vibratory and tandem roller to the desired compaction as per clause 508 of MoSRT&H specification for road and bridge works etc.complete as per direction of EIC. | 198.75 | cum | 14,388.16 | ₹28,59,646.8 |
| 6 | Supplying & Spreading Moorum of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 244 | cum | 716.93 | ₹1,74,930.92 |
| 7 | Providing, fitting, fixing & writting of Km stone, 200mtr stone , Main Information Board & Cautinary sign board etc all complete as per direction of EIC. Main information Board | 1 | nos | 17,113.2 | ₹17,113.2 |
stage.html
html • 0.13 MB
finance_600121.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.65 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 5.95 MB
Tendernotice_1.pdf
PDF • 3.30 MB
BOQ_600121.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .