Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.7 Cr+₹67,065.50 (0.25%)Admitted-Finance | ₹2.7 Cr+₹67,065.50 (0.25%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/S RAKTOM BROTHERS L1 | M/S KUMEY ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00SH-1: Community Hall at Rowiok:- | |||||
| 2.00 | Earth work in excavation over area i/c disposal of excavated earth lead up to 50m and lift up to 1.5m and disposed soil to be levelled and neatly. a) Hard Soil - 40 % | 7,056 | cum | 29.3 ₹2,06,740.8 Lowest | 29.3 ₹2,06,740.8 Lowest |
| 3.00 | b) Hard Soil - 60 % | 10,584 | cum | 40 ₹4,23,360 | 38 ₹4,02,192 Lowest |
| 4.00 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 111.83 | cum | 353 ₹39,475.99 Lowest | 353 ₹39,475.99 Lowest |
| 5.00 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 95 | cum | 5,442.8 ₹5,17,066 Lowest | 5,442.8 ₹5,17,066 Lowest |
| 6.00 | Reinforcement of RCC work including bending, binding and placing in position complete.a) Mild steel. | 2,367.61 | kg | 108.9 ₹2,57,832.73 Lowest | 108.9 ₹2,57,832.73 Lowest |
| 7.00 | Centring and shuttering including strutting proping etc. and removal of form work for: a) Foundations and plinth. | 57.68 | sqm | 471.8 ₹27,213.42 Lowest | 471.8 ₹27,213.42 Lowest |
| 8.00 | c) Columns, pillars and piers. | 81.6 | sqm | 817.5 ₹66,708 Lowest | 817.5 ₹66,708 Lowest |
| 9.00 | d) Lintels, beams, girders, bressumers and cantilevers etc. | 65 | sqm | 623.2 ₹40,508 Lowest | 623.2 ₹40,508 Lowest |
| 10.00 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :a) Foundations and plinth | 70 | cum | 6,551.7 ₹4,58,619 Lowest | 6,551.7 ₹4,58,619 Lowest |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
17 Jul 2026, 4:00 pmClosed
BDO, Damin
Office of the Block Development Officer, CD Block Damin, Kurung Kumey District
C/o Community Hall under VVP in respect of CD-Block Damin (Pkg-II)
2026_DRDAP_3507_1
CD/DMN/VVP/NIT/2025 -26 /II
Open Tender
Civil Works
Item Rate
365 days
Damin
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
BDO, CD Block Damin, Kurung Kumey District
₹2.7 L
18 Aug 2026
11 Jul 2026
18 Jul 2026
11 Jul 2026
17 Jul 2026
11 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SH-1: Community Hall at Rowiok:- | - | - | - | - |
| 2 | Earth work in excavation over area i/c disposal of excavated earth lead up to 50m and lift up to 1.5m and disposed soil to be levelled and neatly. a) Hard Soil - 40 % | 7,056 | cum | - | - |
| 3 | b) Hard Soil - 60 % | 10,584 | cum | - | - |
| 4 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 111.83 | cum | - | - |
| 5 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 95 | cum | - | - |
| 6 | Reinforcement of RCC work including bending, binding and placing in position complete.a) Mild steel. | 2,367.61 | kg | - | - |
| 7 | Centring and shuttering including strutting proping etc. and removal of form work for: a) Foundations and plinth. | 57.68 | sqm | - | - |
| 8 | c) Columns, pillars and piers. | 81.6 | sqm | - | - |
| 9 | d) Lintels, beams, girders, bressumers and cantilevers etc. | 65 | sqm | - | - |
| 10 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :a) Foundations and plinth | 70 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
SBD_Damin_PKG-II.pdf
Tender Documents • 1.84 MB
BOQ_3708.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .