| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.3 LAdmitted-Finance C 145 1 S F TAYYAB LANE SHAHEEN BAGH JAMIA NAGAR OKHLA NEW DELHI 110025 | SOUTH EAST DELHI | DELHI | 110025 | -36.10% | ₹27.3 L | L1 | Admitted-Finance |
| 2 | L2₹30.7 LAdmitted-Finance | -28.08% | ₹30.7 L | L2 | Admitted-Finance |
| 3 | L3₹32.5 LAdmitted-Finance | -24.00% | ₹32.5 L | L3 | Admitted-Finance |
| 4 | L4₹32.7 LAdmitted-Finance PLOT NO 351 JAYADEV VIHAR BHUBANESWAR KHORDHA ODISHA 751013 | BHUBANESWAR | KHORDHA | ODISHA | 751013 | -23.40% | ₹32.7 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Inadequate Work Experience as per Tender T C clause No. 1.2.1 a Page No. 06. |
Tender Value
₹42.7 L
EMD Value
₹85,442
Closing Date
13 Mar 2026, 12:30 pmClosed
EXECUTIVE ENGINEER(CIVIL)
AIIMS BHUBANESWAR
External and Internal painting of common areas of all staff quarters (Type V(A), Type IV, Type III and Type II(B)) in Housing complex, AIIMS Bhubaneswar.
2026_AIIMO_900391_1
AIIMS/BBSR/Engg/017/2025-26
Open Tender
Civil Works
120 days
AIIMS BHUBANESWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹85,442
11 May 2026
27 Feb 2026
16 Mar 2026
27 Feb 2026
13 Mar 2026
27 Feb 2026
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (Including for all heights, necessary support and scaffolding charges etc)
Distempering with 1st quality acrylic distemper (ready mixed) having VOC (Volatile Organic Compound)content less than 50 gms/litre, of approved brand and manufacturer, including applying additional coats wherever required to acheive even shade and colour. Old work . (One or More coats) (Including for all heights, necessary support and scaffolding charges etc)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacturer (Including for all heights, necessary support and scaffolding charges etc)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. (Including for all heights, necessary support and scaffolding charges etc)
One or more coats on old work.
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: Old work (One or more coat applied @ 0.83 ltr/10 sqm).(Including for all heights, necessary support and scaffolding charges etc)
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
12 mm cement plaster of mix 1:4 (1 cement: 4 coarse sand)
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.
Removing dry or oil bound distemper, water proofing cement paint/exterior paint and synthetic enamel paint and like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
eNIT017202526.pdf
Tender Documents • 0.82 MB
BOQ_946395.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid