Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-Finance 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹3.3 Cr | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹3.5 CrRejected-Finance U P SINGH COLONY KANHAIYAPUR VAJIDPUR DISTRICT JAUNPUR U P | ₹3.5 Cr | L2 | Rejected-Finance 2nd Lowest |
| 3 | Rejected-Technical NONE | NEW DELHI | DELHI | 110001 | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical FARIDPUR PACHKHORA BALLIA U P | BALLIA | BALLIA | UTTAR PRADESH | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | m/s ankur and brothers L2 | M/S Singh Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in cutting for correcting internal/outer section of canal by Poclain /JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks, including proper spreading . As per direction of Engineer in charge. | 10,248.5 | Cum | 58.2 ₹5,96,462.7 | 50 ₹5,12,425 Lowest |
| 2.00 | Earth work in filling with carriage for correcting internal/outer section of canal by Poclain /JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks, including proper spreading . As per direction of Engineer in charge. | 12,251.5 | Cum | 200.01 ₹24,50,471.52 | 190 ₹23,27,785 Lowest |
| 3.00 | Dressing of Banks and daula of Canal including requried slope in all type of soils including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. | 63,450 | Sqm | 6.01 ₹3,81,588.3 | 5 ₹3,17,250 Lowest |
| 4.00 | Jungle Clearance on branches below 1000 cusecs Dy's and Minors with SR (complete Section of both bank). As per direction of Engineer in charge. | 9.4 | Km | 4,260.24 ₹40,046.26 | 4,000 ₹37,600 Lowest |
| 5.00 | Dismantling reinforced cement concrete including stacking of dismantled materials within a distance of 60 M.As per direction of Engineer in charge. | 22.59 | Cum | 856.7 ₹19,352.85 | 800 ₹18,072 Lowest |
| 6.00 | Dismantling brick work in cement mortor including stacking of dismantled materials within a distance of 60 m. As per direction of Engineer in charge. | 11.33 | Cum | 403.91 ₹4,576.28 | 400 ₹4,532 Lowest |
| 7.00 | Earth work in foundation in all type of soil mixed with charry, karail, black cottan soil or moorum including all lead & lifts T&P and disposal of surplus earth up to a distance of 100m. from the foundation trenches for proper complation of work. As per direction of Engineer in charge. | 2,743.48 | Cum | 133.86 ₹3,67,242.23 | 130 ₹3,56,652.4 Lowest |
| 8.00 | P/L C.C. 1:3:6 in foundation and gravity floor with one part of cement, three part of coarse sand and six part of stone ballast 20 to 40 size including cost of all materials labour, T&P etc required for proper completion of work per Cum. As per direction of Engineer in charge. | 494.15 | Cum | 6,414.71 ₹31,69,827.46 Lowest | 6,500 ₹32,11,975 |
| 9.00 | First class brick work in 1:4 C.M. with one part of cement and four part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. | 1,066.65 | Cum | 7,189.05 ₹76,68,200.18 Lowest | 7,300 ₹77,86,545 |
| 10.00 | First class brick work in 1:3 C.M. with one part of cement and four part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. | 3.86 | Cum | 7,404.69 ₹28,582.1 Lowest | 7,500 ₹28,950 |
Tender Value
₹3.6 Cr
EMD Value
₹7.1 L
Closing Date
16 Jun 2026, 2:00 pmClosed
Superintending Engineer
S.E. 18th Circle Irrigation works, Govindpur, Prayagraj
Restoration work of earth and Pucca works in internal and external section from Km. 0.000 to Km. 9.400 of Danganj rajwaha in Varanasi Districts.(Lot-03)
2026_UPIDC_1158198_3
02/S.E./2026-27
Open Tender
Civil Works - Canal
Item Rate
S.E. 18th Circle Irrigation works Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,919
₹7.1 L
Prayagraj
30 Jul 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting for correcting internal/outer section of canal by Poclain /JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks, including proper spreading . As per direction of Engineer in charge. | 10,248.5 | Cum | - | - |
| 2 | Earth work in filling with carriage for correcting internal/outer section of canal by Poclain /JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks, including proper spreading . As per direction of Engineer in charge. | 12,251.5 | Cum | - | - |
| 3 | Dressing of Banks and daula of Canal including requried slope in all type of soils including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. | 63,450 | Sqm | - | - |
| 4 | Jungle Clearance on branches below 1000 cusecs Dy's and Minors with SR (complete Section of both bank). As per direction of Engineer in charge. | 9.4 | Km | - | - |
| 5 | Dismantling reinforced cement concrete including stacking of dismantled materials within a distance of 60 M.As per direction of Engineer in charge. | 22.59 | Cum | - | - |
| 6 | Dismantling brick work in cement mortor including stacking of dismantled materials within a distance of 60 m. As per direction of Engineer in charge. | 11.33 | Cum | - | - |
| 7 | Earth work in foundation in all type of soil mixed with charry, karail, black cottan soil or moorum including all lead & lifts T&P and disposal of surplus earth up to a distance of 100m. from the foundation trenches for proper complation of work. As per direction of Engineer in charge. | 2,743.48 | Cum | - | - |
| 8 | P/L C.C. 1:3:6 in foundation and gravity floor with one part of cement, three part of coarse sand and six part of stone ballast 20 to 40 size including cost of all materials labour, T&P etc required for proper completion of work per Cum. As per direction of Engineer in charge. | 494.15 | Cum | - | - |
| 9 | First class brick work in 1:4 C.M. with one part of cement and four part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. | 1,066.65 | Cum | - | - |
| 10 | First class brick work in 1:3 C.M. with one part of cement and four part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work. As per direction of Engineer in charge. | 3.86 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Document3.pdf
Tender Documents • 2.64 MB
BOQ_2170726.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].