Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹3.0 L+₹30,921.76 (11.5%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹3.1 L+₹40,606 (15.1%)Rejected-AOC | L3 | Rejected-AOC Rejected | |
| 4 | L4₹3.2 L+₹47,652 (17.8%)Rejected-AOC | L4 | Rejected-AOC Rejected | |
| 5 | L5₹3.2 L+₹47,998 (17.9%)Rejected-AOC | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | RAJKUMARI L6 | M/S PARAS ENTERPRISES L8 | M/S RAMNATH CONTRACTOR L3 | M/S SAGEER AHMAD L5 | BALA JI TRADERS L1 | M/S DEVENDRA PAL SINGH L7 | M/S SATYA PRAKASH SHARMA CONTRACTOR L2 | M/S J K INTERLOCKING BRICKS L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearence i/c lift upto 1.50m & lead upto 30m i/c ramming and drassing by manual labour or machine. The earth from clearance to be used in side embankment or to be deposit of at spoil banks as directed by engineer in charge. | 7,692 | cum | 41 ₹3,15,372 | 54.12 ₹4,16,291.04 | 39.5 ₹3,03,834 | 40.5 ₹3,11,526 | 34 ₹2,61,528 Lowest | 45 ₹3,46,140 | 38.28 ₹2,94,449.76 | 40 ₹3,07,680 |
| 2.00 | Supply and Fixing of of Sign Board at Site. I/C all Cost of Material ,Labour , T. &. P. etc. complete. | 1 | No. | 6,000 ₹6,000 | 4,100 ₹4,100 Lowest | 4,800 ₹4,800 | 4,500 ₹4,500 | 6,500 ₹6,500 | 7,000 ₹7,000 | 4,500 ₹4,500 | 8,000 ₹8,000 |
Tender Value
₹5.1 L
EMD Value
₹11,000
Closing Date
3 Jun 2026, 11:00 amClosed
Executive Engineer Flood Division Budaun
Executive Engineer Flood Division Budaun Near LIC Office Awas Vikas Colony Civil Line Buduan
Earth Work in Silt Clearance of Chhoiya Drain from Km. 0.000 to 12.650 in District Budaun.
2026_UPIDC_1155019_6
01/EE/2026-27
Open Tender
Civil Works
Item Rate
Budaun
Please refer Tender documents.
3 documents required · 3 mandatory
₹354
₹11,000
Yes
19 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearence i/c lift upto 1.50m & lead upto 30m i/c ramming and drassing by manual labour or machine. The earth from clearance to be used in side embankment or to be deposit of at spoil banks as directed by engineer in charge. | 7,692 | cum | - | - |
| 2 | Supply and Fixing of of Sign Board at Site. I/C all Cost of Material ,Labour , T. &. P. etc. complete. | 1 | No. | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_2163559.xls
BOQ • 0.28 MB
NIT.pdf
Tender Documents • 3.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .