| 1 | l1₹1.9 LAccepted-AOC AT PO PHUSRO DIST BOKARO JHARKHAND 829104 | BOKARO | JHARKHAND | 829104 | l1 | Accepted-AOC l1 | |
| 2 | Rejected-Technical 01 PURANA DAKKHANA CIVIL LINE GANDHI NAGAR BASTI UTTAR PRADESH 272001 | BASTI | UTTAR PRADESH | 272001 | - | Rejected-Technical l3 | |
| 3 | Rejected-Technical | - | Rejected-Technical l2 |
| Sl No | Description | Qty | Unit | M/S SHREE TIRUPATI TRADERS L2 | M/S MITHI ENTERPRISES L1 | M/s Geeta Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.01 | Supply and providing of 3.3 kV Bushing with Studs | 3 | no. | 8,800 ₹26,400 | 8,760 ₹26,280 Lowest | 9,000 ₹27,000 |
| 1.02 | Supply and providing of Winding Temperature Meter | 1 | no. | 6,100 ₹6,100 | 6,025 ₹6,025 Lowest | 6,250 ₹6,250 |
| 1.03 | Supply and providing of Oil Temperature Meter | 1 | no. | 6,100 ₹6,100 | 6,025 ₹6,025 Lowest | 6,250 ₹6,250 |
| 1.04 | Replacement of Nuts, Bolts, Washers, Tie Rod, Silical Gel | 1 | Job | 16,500 ₹16,500 | 16,425 ₹16,425 Lowest | 16,500 ₹16,500 |
| 1.05 | Changing of all gasket | 1 | Job | 42,000 ₹42,000 | 41,610 ₹41,610 Lowest | 42,500 ₹42,500 |
| 1.06 | Supplya and providing of Auxiliary Contactor 110 V system for tripping arrangement of above meter | 1 | no. | 4,500 ₹4,500 | 4,380 ₹4,380 Lowest | 4,500 ₹4,500 |
| 1.07 | Supply and providing of Bucholz Relay Aluminium Dia Recasted & Mercury and tube | 1 | no. | 28,500 ₹28,500 | 28,470 ₹28,470 Lowest | 28,500 ₹28,500 |
| 1.08 | Supply and providing of Auxiliary Relay of 110 V DC of tripppng circuit | 1 | no. | 11,500 ₹11,500 Lowest | 11,500 ₹11,500 Lowest | 11,500 ₹11,500 Lowest |
| 1.09 | Supply and providing of 16 core 1.5 sq. mm Cu Conductor Control Cable for wiring circuit | 40 | mtr. | 475 ₹19,000 | 470 ₹18,800 Lowest | 475 ₹19,000 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹1.7 L
EMD Value
₹2,200
Closing Date
19 Jan 2024, 11:40 amClosed
P.E. (EnM), Karo OCP
P.O. Bermo, Dist. Bokaro, Jharkhand 829104
Onsite Repair of the tripping arrangement Bucholz Relay H.T. Bushing Studs and other accessories of the 11 kV by 3.3 kV 1.6 MVA Sr. No. 4015095 EEF make Transforme installed at the 11 kV by 3.3 kV Main Substation of Karo OCP under BnK Area
2024_CCL_298114_1
P.E. (EnM)/ Karo OCP/ e-tender/ 2023-24/ 53
Open Tender
Electrical and Maintenance Works
Item Rate
7 days
Office of the P.O. (Karo OCP)
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,200
Yes
15 Aug 2025
10 Jan 2024
20 Jan 2024
10 Jan 2024
19 Jan 2024
11 Jan 2024
10 Jan 2024 - 19 Jan 2024
Amount
Supply and providing of 3.3 kV Bushing with Studs
Supply and providing of Winding Temperature Meter
Supply and providing of Oil Temperature Meter
Replacement of Nuts, Bolts, Washers, Tie Rod, Silical Gel
Changing of all gasket
Supplya and providing of Auxiliary Contactor 110 V system for tripping arrangement of above meter
Supply and providing of Bucholz Relay Aluminium Dia Recasted & Mercury and tube
Supply and providing of Auxiliary Relay of 110 V DC of tripppng circuit
Supply and providing of 16 core 1.5 sq. mm Cu Conductor Control Cable for wiring circuit
Total impact of GST for the purpose of CTC
M/S SHREE TIRUPATI TRADERS
M/s Geeta Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .