| 1 | ₹1.4 Craccepted-aoc | ₹1.4 Cr | accepted-aoc |
Tender Value
₹1.4 Cr
EMD Value
₹2.1 L
Closing Date
13 Feb 2026, 10:30 pmClosed
Minor Irrigation Department
EXECUTIVE ENGINEER
CONSTRUCTION OF CHECKDAM
MI/2025-26/DA/WORK_INDENT10702
MI/2025-26/DA/WORK_INDENT10702
Open
Dam and Allied works
Two Tender Document System(Two Cover)
Minor Irrigation Division Mandya
9 documents required · 9 mandatory
each Tenderer in its name should have in the last five years i.e., 2020-21, 2021-22, 2022-23, 2023-24 and 2024-25 Satisfactory completion (at least 90% of the contract value), as Prime contractor, at least one similar work such as Construction of check dam/ Bridge Cum Check dam of value not LESS THAN RS 68.57 LAKHS. during the last five years. (Usually not less than 50% estimated value of contract). Financial turnover and cost of completed works of previous years shall be given weightage of 10% per year based on the rupee value to bring them to 2025-26 price level
Each Tenderer in its name should have in the last five years i.e.2020-21, 2021-22, 2022-23, 2023-24 and 2024-25 ,Executed in any one year (for a continuous period of 12 months) the minimum quantities of work (usually 80% of annual requirement) for works costing up to Rs.100.00 lakhs,01.Earthwork excavation, Embankment, Filling and Desilting (Combined Quantity)-11900.00cum. 02 Cement Concrete both PCC and RCC (Combined Quantity)-1260.00cum 03.Fabrication of reinforcement steel -9.65tonne
Valid registration certificate
List of existing commitments and ongoing works
List of works for which tenders already submitted
valid GST Registration Details
each Tenderer in its name should have in the last five years i.e. 2020-21, 2021-22, 2022-23, 2023-24 and 2024-25,Achieved in at least two financial years a minimum financial turnover (In all classes of Civil Engineering Construction works) of Rs 274.30 Lakhs. Annual turnover certificate along with balance sheet certified/attested by chartered accountant should be uploaded with18 digit System generated UDIN number. Financial turnover and cost of completed works of previous years shall be given weightage of 10% per year based on the rupee value to bring them to 2025-26 price level
Liquid assets and /or availability of credit facilities of not less than Rs 43.10 Lakhs (Credit lines/letter of credit/certificates from banks for meeting the fund requirement etc.) in the Prescribed Format
Contractor should produce the updated G.S.T Clearance Certificates, IT Returns, Profit and Loss Statements along with balance sheets issued by Chartered Accountant for the years from 2020 TO 2024-25
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Banker Details for reference
Reports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five years
Item Rates are Exclusive of GST and amount to tender is also Exclusive of GST hence the contractor should quote his/ her rate Exclusive of GST.
The Bidder shall quote Rates WITHOUT adding GST for either materials or works Contract (Service)GST payable by the contractor under this work/contract will be paid to the contractor.
Latest Address and contact number for communication to be furnished
₹3,430
₹2.1 L
13 Feb 2026
6 Feb 2026
16 Feb 2026
11 Feb 2026
10 Feb 2026
TENTATIVE PHYSICAL / FINANCIAL ACTIVITY CHART
CONSTRUCTION OF CHECKDAM ACROSS ULLAMBAHALLA FLOWING NEAR MEGALAPURA VILLAGE IN MALAVALLI TALUK MANDYA DISTRICT
Total Duration - 11 Months (Including Monsoon)
Indent No:MI/2025-26/DA/WORK_INDENT10702
Sl. No. ITEM CODE Activity Unit Quantity Rate Amount ( in Rs) Physical Financial Progress (in lakhs)
1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 7th Month 8th Month 9th Month 10th Month 11th Month Total Check
PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL PHYSICAL FINANCIAL FINANCIAL PHYSICAL
1 VOL4,IN8.2.1 Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.complete with all lead and lift including Machineries loading and unloading charges and as per the Direction Of Engineer In Charge Of The work. Each 350.00 25.50 8925.00 350.00 8925.00 0.00 0.00 350.00 8925.00 0.00 0.00
2 VOL4P2,IN3.12 De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machinery, labour & all necessary works as directed and complete as per specification.complete with all lead and lift including Machineries loading and unloading charges.and as per the Direction Of Engineer In Charge Of The work. Cum 11250.00 54.00 607500.00 11250.00 607500.00 11250.00 607500.00 0.00 0.00
3 VOL1,IN1.14.1 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work, In all kinds of soils Depth upto 3 m. complete with all lead and lift including Machineries loading and unloading charges.and as per the Direction Of Engineer In Charge Of The work. Cum 1691.82 102.00 172565.64 1691.82 172565.64 0.00 0.00 0.00 0.00 1691.82 172565.64 0.00 0.00
4 VOL1,IN1.15.1 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In ordinary/soft rock without blasting upto 1.5 m depth.complete with all lead and lift including Machineries loading and unloading charges and as per the Direction Of Engineer In Charge Of The work. Cum 240.41 363.00 87267.02 240.41 87267.02 0.00 0.00 0.00 0.00 240.41 87267.02 0.00 0.00
5 VOL4P1,IN2.13 Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.complete with all lead and lift including Machineries loading and unloading charges and as per the Direction Of Engineer In Charge Of The work. Cum 120.20 5989.00 719892.77 21.29 127505.81 98.91 592386.96 120.20 719892.77 -0.00 -0.00
6 VOL4P2,IN1.12. Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/ sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.complete with all lead and lift including Machineries loading and unloading charges and as per the Direction Of Engineer In Charge Of The work. Cum 1445.07 6843.00 9888620.43 100.00 684300.00 175.00 1197525.00 100.00 684300.00 125.00 855375.00 120.00 821160.00 150.00 1026450.00 100.07 684779.01 160.00 1094886.42 0.00 0.00 165.00 1129095.00 250.00 1710750.00 1445.07 9888620.43 0.00 -0.00
7 VOL1,IN2.11h Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.All other type of structures.complete with all lead and lift including Machineries loading and unloading charges and as per the Direction Of Engineer In Charge Of The work. tonne 12.03 69749.00 839371.67 0.00 0.00 3.10 216221.90 0.00 0.00 0.00 0.00 5.00 348745.00 0.00 0.00 0.00 0.00 3.93 274404.77 0.00 0.00 0.00 0.00 0.00 0.00 12.03 839371.67 -0.00 -0.00
8 VOL3,IN12.2 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications.complete with all lead and lift including Machineries loading and unloading charges and as per the Direction Of Engineer In Charge Of The work. m 102.00 239.00 24378.00 102.00 24378.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.00 24378.00 0.00 0.00
9 VOL4P1,IN3.41.2 Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.300mm thick.complete with all lead and lift including Machineries loading and unloading charges and as per the Direction Of Engineer In Charge Of The work. Sqm 100.00 455.00 45500.00 100.00 45500.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 45500.00 0.00 0.00
10 VOL4P2,IN1.8 Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.complete with all lead and lift including Machineries loading and unloading charges and as per the Direction Of Engineer In Charge Of The work. Cum 154.50 1278.00 197451.00 0.00 0.00 54.50 69651.00 100.00 127800.00 154.50 197451.00 0.00 0.00
11 VOL4P1,IN3.3 Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete.complete with all lead and lift including Machineries loading and unloading charges and as per the Direction Of Engineer In Charge Of The work. Cum 1565.00 629.00 984385.00 0.00 0.00 0.00 0.00 0.00 0.00 250.00 157250.00 250.00 157250.00 165.00 103785.00 450.00 283050.00 450.00 283050.00 1565.00 984385.00 0.00 0.00
12 VOL3,IN12.3 a Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification.complete with all lead and lift including Machineries loading and unloading charges and as per the Direction Of Engineer In Charge Of The work. Cum 119.35 1168.00 139397.88 0.00 0.00 119.35 139397.88 0.00 0.00 0.00 0.00 0.00 119.35 139397.88 0.00 0.00
Milestone 1st Milestone 2nd Milestone 3rd Milestone 4th Milestone
APT 13715243.21 Milestones and liquidity damages
13715254.40 MILESTONES AMOUNT Liquidity damage
Mile Stone 2 7836954.21 7,837 Per day 32,292.00
Earthwork excavation+Desilting+ Embankment +Filling Combined Qty 14866.57 Cum 11900.00 CUM 11,893.26 CUM
Fabrication Of Steel 12.03 Tonne 9.65 Tonne 9.63 CUM
4571747.737 Cement Contrete 1565.27 Cum 1260.00 cum 1,252.22 CUM
metal beam crash barrier system #REF! Mtr #REF!
27430486.42 Annual turn over Rs.274.30 Lakhs Rs Rs.274.30 Lakhs 274.30 CUM 6857621.605
54 Line of credit Rs.43.10 Lakhs Rs Rs.43.10 Lakhs
6857621.605 Similar nature of work Rs.68.57 Lakhs Rs Rs.68.57 Lakhs 6,857,621.61 CUM
TENTATIVE PHYSICAL / FINANCIAL ACTIVITY CHART
CONSTRUCTION OF CHECKDAM ACROSS ULLAMBAHALLA FLOWING NEAR MEGALAPURA VILLAGE IN MALAVALLI TALUK MANDYA DISTRICT
Total Duration -11 Months (Including Monsoon)
1st month 2nd month 3rd month 4th month 5th month 6th month 7th month 8th month 9th month 10th month 11th month
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
labour.docx
Instructions to Tenderers • 0.98 MB
MEGALAPURA Pert Chart.xlsx
Instructions to Tenderers • 0.25 MB
Insu surety Bond-Performance secu-pdf.pdf
Instructions to Tenderers • 0.43 MB
KW-4 Megalapura.doc
Tender Document • 7.71 MB
Royalty Circular.pdf
Instructions to Tenderers • 4.41 MB
FD417EXP-12-2024-Dtd-09-08-2024.pdf
Instructions to Tenderers • 0.12 MB
mineral dispatch permit.zip
Instructions to Tenderers • 6.45 MB
Megalapura Drawing 02-Feb-2026 08-46-27.pdf
Instructions to Tenderers • 0.34 MB
KMMCR rule.pdf
Instructions to Tenderers • 0.28 MB
ECV.jpeg
Instructions to Tenderers • 0.21 MB
star_rates.pdf
Instructions to Tenderers • 2.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .