| 1 | L1₹28.9 LAccepted-AOC | ₹28.9 L | L1 | Accepted-AOC M/S Tanishaq Enterprises L-1 |
| 2 | L2₹29.2 LRejected-Finance | ₹29.2 L | L2 | Rejected-Finance Rejected,BeingL-2 |
| 3 | L3₹29.7 LRejected-Finance 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹29.7 L | L3 | Rejected-Finance Rejected,BeingL-2 |
| 4 | Rejected-Technical MOHALLA MUNNGANJ WARD NO 5 GOLA DISTRICT LAKHIMPUR KHERI UTTAR PRADESH | GOLA | LAKHIMPUR KHERI | UTTAR PRADESH | - | - | Rejected-Technical Being Non Responsive |
| Sl No | Description | Qty | Unit | M/S SINGH CONSTRUCTION L3 | M/S TANISHAQ ENTERPRISES L1 | M/S UDDESHYA TRADERS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in foundation i/c. lift upto 1.5m. and lead upto 30m. with back filling including cost of labour and T&Petc. Required for proper completion of work as directed by Engineer-in-charge. | 55.05 | Cum | 115.8 ₹6,374.79 | 112.8 ₹6,209.64 | 114 ₹6,275.70 |
| 2.00 | Cement concrete 1:4:8 (1cement:4coarse sand:8stone grit) in base of foundation i/c. cost of all materials,labour and T&P etc.required for proper completion of work as directed by Engineer-in-charge. | 16.52 | Cum | 6,057 ₹1.0 L | 5,900 ₹97,468 | 5,962.86 ₹98,506.45 |
| 3.00 | R.R. stone masonry work in 1:4 cement coarse sand mortar i/c. cost of all materials ,labour and T&P etc. required for proper completion of work as directed by Engineer-in-charge. | 94.02 | Cum | 5,156.1 ₹4.8 L | 5,022.5 ₹4.7 L | 5,067 ₹4.8 L |
| 4.00 | Cement concrete 1:2:4 (1cement:2coarse sand:4stone grit) top of stone masonry work i/c. cost of all materials,labour and T&P etc.required for proper completion of work as directed by Engineer-in-charge. | 63.78 | Cum | 6,566 ₹4.2 L | 6,396 ₹4.1 L | 6,463.94 ₹4.1 L |
| 5.00 | Providing & laying R.B.M. filter below pitching i/c. all lifts & leads ,dressing and compaction with cost of all materials,labour and T&P etc. required for proper completion of work as directed by Engineer-in-charge. | 646.47 | Cum | 1,792.85 ₹11.6 L | 1,746.43 ₹11.3 L | 1,765 ₹11.4 L |
| 6.00 | Relaying hand packed boulder 20-40 kg. wt. in pitching including cost of all labour & T&P etc as directed by Engineer in charge. | 691.83 | Cum | 400 ₹2.8 L | 389.16 ₹2.7 L | 393.3 ₹2.7 L |
| 7.00 | Providing & laying hand packed Boulder 20- 40 kg. wt. in pitching 0.23m. thick including cost of all materials, labour and T&P etc. required for proper completion of work as directed by Engineer-in-charge. | 238.08 | Cum | 2,186.4 ₹5.2 L | 2,129.76 ₹5.1 L | 2,152.41 ₹5.1 L |
Tender Value
₹31 L
EMD Value
₹62,000
Closing Date
20 Jan 2026, 11:00 amClosed
Executive Engineer ,Head works Division, Sarda can
Executive Engineer, Head works Division, Sarda canal Bareilly.
Janpad Champawat ke antargat Sharda Bairaj Banbasa ke U/S main Varma Spur, Nepal Spur Avm Dayen Aflax Bundh ke kshatigrast D/S Slop kee Marmmat ke Karya.
2026_UPIDC_1104293_1
E-Tender Notice No 07/EE/2025-26
Open Tender
Civil Works - Canal
30 days
Banbasa
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹62,000
Yes
14 May 2026
13 Jan 2026
20 Jan 2026
13 Jan 2026
20 Jan 2026
13 Jan 2026
Earth work excavation in foundation i/c. lift upto 1.5m. and lead upto 30m. with back filling including cost of labour and T&Petc. Required for proper completion of work as directed by Engineer-in-charge.
Cement concrete 1:4:8 (1cement:4coarse sand:8stone grit) in base of foundation i/c. cost of all materials,labour and T&P etc.required for proper completion of work as directed by Engineer-in-charge.
R.R. stone masonry work in 1:4 cement coarse sand mortar i/c. cost of all materials ,labour and T&P etc. required for proper completion of work as directed by Engineer-in-charge.
Cement concrete 1:2:4 (1cement:2coarse sand:4stone grit) top of stone masonry work i/c. cost of all materials,labour and T&P etc.required for proper completion of work as directed by Engineer-in-charge.
Providing & laying R.B.M. filter below pitching i/c. all lifts & leads ,dressing and compaction with cost of all materials,labour and T&P etc. required for proper completion of work as directed by Engineer-in-charge.
Relaying hand packed boulder 20-40 kg. wt. in pitching including cost of all labour & T&P etc as directed by Engineer in charge.
Providing & laying hand packed Boulder 20- 40 kg. wt. in pitching 0.23m. thick including cost of all materials, labour and T&P etc. required for proper completion of work as directed by Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_2037080.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid