| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L | L1 | Accepted-AOC deed complete |
| 2 | L2₹8.5 LSame as L1Rejected-Finance | ₹8.5 LSame as L1 | L2 | Rejected-Finance Not selected in lottery |
Tender Value
₹10.0 L
EMD Value
₹99,841
Closing Date
20 May 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Road improvement and toilet construction works within the GSVM College campus,Tilak Nagar under Ward-61 Zone-4.
2026_NNKAN_1146975_1
856/AA-4/25-26
Open Tender
Civil Works
Percentage
45 days
Ward-61
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,841
20 Aug 2026
16 May 2026
20 May 2026
16 May 2026
20 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in trenches for foundations pipes cable etc in ordinary soil(Loan clay or sand) including lift upto 1.5 m. lead upto 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed | 46.5 | cum | 174 | ₹8,091 |
| 2 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engg-in-charge:2.1.1 All kinds of soil. | 40.5 | cum | 170 | ₹6,885 |
| 3 | Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place | 16.2 | cum | 3,671 | ₹59,470.2 |
| 4 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:1.5:3 (1 cement: 1.5 coarse sand (zone-iii): 3 graded stone aggregate 200 mm nominal | 16.2 | cum | 7,160 | ₹1,15,992 |
| 5 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 cement :4 coarse sand (zone-III): 8 graded stone aggregate 40 mm nominal size) (SOR-CH-5-Si no.1-4.1.8) | 2.1 | cum | 5,740 | ₹12,054 |
| 6 | Reinforced cement cocrete work in walls (any thickness), including attached pilasters, buttreses, plinth and string courses, fillets & in coloumns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding | 3.11 | cum | 8,600 | ₹26,746 |
| 7 | Reinforced cement concrete work in beam, suspended floors, roofs having slope up to 15" landing, bolconies, shelves, chajjas, lintels, bands, plain, window sills, stair cases and spiral stair cases above plinth up to floor five, level excluding the cost of centering. | 3.08 | cum | 8,720 | ₹26,857.6 |
| 8 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including | 485.92 | kg | 72 | ₹34,986.24 |
| 9 | Brick work with common burnt clav (non modular) bricks of class-150 in foundation and plinth in cement memar 1:4 (1 cement:4 coarse sand, SOR-Ch no.6-1-6.1.1) | 6.96 | cum | 6,600 | ₹45,936 |
| 10 | 12mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand) | 37.8 | sqm | 200 | ₹7,560 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2144998.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.66 MB
BOQ_2144998.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .