Loading…
Loading…
Tender Value
₹12.6 L
EMD Value
₹25,280
Closing Date
5 Oct 2026, 4:00 pm
Er. Shamis Din
Executive Engineer PWD RNB Division Kishtwar
Please refer BOQ
2026_PWDJK_326179_6
e-NIT No. 62 of 2026-27 Dated 26-09-2026
Open Tender
Civil Works
Percentage
30 days
KISHTWAR
Please refer NIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RNB Division Kishtwar
₹25,280
26 Sept 2026
26 Sept 2026
6 Oct 2026
26 Sept 2026
5 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.32 | cum | 5,733.6 | ₹24,769.15 |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with
5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 32.4 | cum | 9,821.85 | ₹3,18,227.94 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 5,184 | kg | 123.2 | ₹6,38,668.8 |
| 4 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 560 | kg | 181.6 | ₹1,01,696 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases for columns | 14.4 | sqm | 286.35 | ₹4,123.44 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: EDGES OD SLAB above 20 cm wide | 20.25 | sqm | 1,145.1 | ₹23,188.27 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 99 | sqm | 718.2 | ₹71,101.8 |
| 8 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. | 117 | cum | 189.2 | ₹22,136.4 |
| 9 | Add Provision for Foundation/ inaugration Stone Complete Job | 1 | job | 20,000 | ₹20,000 |
| 10 | Mulba at an average lead of 5 km by MT | 117 | cum | 200.74 | ₹23,486.58 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BOQ_1103044.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .