Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance GUDLIXA | Admitted-Finance |
| 3 | Not Admitted-PreQual/Technical 16 SHIVA COLONY II RAM NAGAR SODALA JAIPUR 302006 | JAIPUR | JAIPUR | RAJASTHAN | 302006 | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹19.4 L
Closing Date
27 Dec 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Senior Regional Manager
Senior Regional Manager RIICO Ltd EPIP Sitapura
Preparation and distribution of water bills of all Industrial Areas under jurisdiction of Unit EPIP Sitapura Jaipur
2021_RIICO_251181_1
38/EPIPsitapura/2021-22/2006/2
Open Tender
Civil Works
Item Rate
730 days
Industrial Areas under jurisdiction of Unit EPIP S
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,180
RIICO LTD
Exempted
5 Jan 2022
17 Dec 2021
29 Dec 2021
17 Dec 2021
27 Dec 2021
17 Dec 2021
90 days
Amount
Preparation and distribution of monthly water bills as per detailed scope of work as under: The Scope of Work:-The work of taking water meter reading with preparation and distribution of water consumption bills with Water Billing Module of RIICO ERP software in prescribed format. The work of updation of monthly ledger posting of issued bills, deposited bills (recovery/realization), preparation of monthly outstanding dues list, preparation of Defective /Stopped meter list, and preparation of duplicate water bills.The work of processing and updation of all types of permission applications received for works related to Water Billing Module (WBM) like new water connections/ Disconnections/ ReConnections/Replacement of Water Meter/ Change of Name, Size etc. and other allied works related to WBM. The work of updation of New Binders and Ledgers for each financial year. Preparation of Water dues balance sheet and reconciliation of water dues recovery with financial ledger. The scope include providing services with requisite manpower and all leviable Central/State taxes, transportation etc. complete as per the direction of Engineer in Charge. Only New Binders, Ledgers and stationery for water bill printing related to water connections for each financial year shall be provided by the corporation.
Preparation and updation of monthly water bills as per detailed scope of work as under: The Scope of Work:- The work of taking water meter reading with preparation of water consumption bills with Water Billing Module of RIICO ERP software in prescribed format. The work of updation of monthly ledger posting of generated data of water connections, deposited bills (recovery/realization), preparation of monthly outstanding dues list, preparation of Defective /Stopped meter list, The work of processing and updation of all types of permission applications received for works related to Water Billing Module (WBM) like new water connections/ Disconnections/ ReConnections/Replacement of Water Meter/ Change of Name, Size etc. and other allied works related to WBM. The work of updation of New Binders and Ledgers for each financial year. Preparation of Water dues balance sheet and reconciliation of water dues recovery with financial ledger. The scope include providing services with requisite manpower and all leviable Central/State taxes, transportation etc. complete as per the direction of Engineer in Charge. Only New Binders, Ledgers and stationery for water bill printing related to water connections for each financial year shall be provided by the corporation.
Labour charges of releasing new water connections from distribution system of different sizes 1/2" & above including digging for pipeline, making hole in pipeline, fixing clamp on pipeline and fixing of ferrule with G.I. Pipe for release of a new water connection and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges of making water connection D.C. or R.C. from distribution system of different sizes. 1/2" & onwards including digging for pipeline, making hole/ plugging hole in pipeline, removal or fixing of ferrule with G.I. Pipe for R.C or D.C. water connection and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges for Removing / Refixing / Replacement of water meter for repairing, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges for crossing the water connection pipe under the road crust by manual / mechanical means, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges for dismantling of cement concrete/ RCC Platform for making new connection /D.C./ R.C. at site, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges of checking water connections at connection point from distribution system of different sizes 1/2" & above including digging at connection point for pipeline, checking ferrule point, checking clamp on pipeline and aligning of ferrule with G.I. Pipe for proper flow of water to pipe line and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges of checking disconnected water connections at connection point and nearby from distribution system of different sizes 1/2" & above including digging at connection point for pipeline, checking ferrule point, checking clamp on pipeline and alignment of ferrule with G.I. Pipe if any found at site and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Pawan Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .