Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹10.3 L+₹3,702.40 (0.36%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹10.7 L+₹46,742.81 (4.55%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹12.8 L+₹2.5 L (24.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15.4 L
EMD Value
₹30,852
Closing Date
4 May 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Construction of pre fab Hut of Chowkidar Room with Mini Office for Campus to University of Jammu at Rakh Arath Budgam (Foundation)
2026_PWDJK_308422_1
NIT_No_07_DB_2026-27
Open Tender
Civil Works
Percentage
60 days
Bemina
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
Executive Engineer RnB Division Budgam
₹30,852
8 May 2026
22 Apr 2026
5 May 2026
22 Apr 2026
4 May 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanicall means in trenches for foundations, drains, pipes, cables etc.upto required depthh and size, including dressing of sides and ramming of bottoms, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil | |||||
| 2Providing and laying of stone soling, hand packed, including carriage of same from approved source upto site of work complete. | |||||
| 3P/ L in position cement concrete in 1:4:8(1 cement :4 coarse sand : 8 graded crushed stone aggregate, 40mm nominal size) excluding the cost of centering and shuttering but including carriage(30km) of all materials from approved sources up to site of work complete. | |||||
| 4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | |||||
| 5Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 6Reinforcement for RCC work including straightening cutting, bending, placing in position and binding all complete (Thermo mechanically treated bars) including all carriages complete. | |||||
| 7Centering & shuttering including strutting, propping etc including removal of form work. Foundations, footings, bases for columns, plinth | |||||
| 8Supplying and filling in plinth with RBM/NALLAH MUCK including top 1'0" with fine sand under floors including, watering, ramming, consolidating and dressing complete. | |||||
| 9carriage of materials by mt | |||||
| 9.01 | Stone agg lead 10 km | 120.53 | cum | 279.04 | ₹33,632.13 |
stage.html
html • 0.02 MB
finance_999531.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_999531.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .