Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 980 C SHANDAMA SHIVPURI ALLAHABAD | Admitted-Finance |
| 2 | Admitted-Finance 0 DHANA TEJA BARARI DHANA TEJA MATHURA MATHURA UTTAR PRADESH 281005 | MATHURA | UTTAR PRADESH | 281005 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
30 Sept 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E. AMBEDKARNAGAR
S.E.,E.D.C.,AMBEDKAR NAGAR
Increasing Capacity of T/F Under Business Plan In The Jurisdiction Of Electricity Distribution Division-Akbarpur (Ambedkarnagar
2021_MVVNL_615916_2
42-EDC(A)/2021-22
Open Tender
Electrical Works
Lump-sum
90 days
Akbarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
S.E.,E.D.C.,Akbarpur, Ambedkar Nagar
₹5,000
11 Oct 2021
21 Sept 2021
30 Sept 2021
21 Sept 2021
30 Sept 2021
21 Sept 2021
90 days
Amount
Cartage including loading, unloading & Proper Stacking of following stock materials from Store Centre/Departmental Store to Dump site distance o to 40 Kms.
A. PCC Pole 8.5 Mtr. Long
B. ACSR Weasel Conductor
C. AB Cable (3x50) sqmm.
D. Transformer 25 KVA
E. Transformer 63 KVA
F. Transformer 100 KVA
G. Other matching material
Dragging of PCC Pole from dump site to pit site
Grouting & Binding of Stay in 1:4:8 ratio with Cement, sand and Brick Ballast including cost of all Grouting materials as per RESSPO Norms.
Earthing of Poles/Transformers as per RESSPO Norms
Fabrication & Erection of Double Pole Support on PCC Pole including digging of pit and fixing of all accessories as per RESSPO Norms.
Fabrication & Erection of Single Pole Support on PCC Pole including digging of pit and fixing of all accessories as per RESSPO Norms.
Stringing, Sagging, Binding & Jumpering of ACSR Weasel Conductor as per RESSPO Norms.
Stringing, Sagging, Binding & Jumpering of 3X50 mm2 AB Cable as per RESSPO Norms.
Grouting of PCC pole in 1:4:8 ratio with Cement, sand and Brick Ballast including cost of all Grouting materials as per RESSPO Norms.
Hanging and hosting of 3.5x240/3.5x70 mm. PVC cable as per RESSPO Norms.
Mounting of 25 KVA Transformer on Double Pole Structure as per RESSPO Norms
Mounting of 63 KVA Transformer on Double Pole Structure as per RESSPO Norms
Mounting of 100 KVA Transformer on Double Pole Structure as per RESSPO Norms
Dismantling of 10/16 KVA Transformer from Double Pole & Cartage upto departmental Store (Distance Approx. 40 Kms.)
Dismantling of 25 KVA Transformer from Double Pole & Cartage upto departmental Store (Distance Approx. 40 Kms.)
Dismantling of 63 KVA Transformer from Double Pole & Cartage upto departmental Store (Distance Approx. 40 Kms.)
VIDHYA ENTERPRISES
M/s S.K. CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .